Font Size: a A A

The Study On The Reform Of HN Power Plant Boiler Dust Precipitator Project Risk Management

Posted on:2017-12-20Degree:MasterType:Thesis
Country:ChinaCandidate:C FengFull Text:PDF
GTID:2311330488459598Subject:Business administration
Abstract/Summary:PDF Full Text Request
All kinds of relationship between the risk of the project is also growing and complex, Engineering project risk has become one of the important problems of project managers is more and more attention.Since July 1,2014,The coal-fired power plant boiler soot concentration limit of 30mg/Nm3, The electric renovation project gradually become one of the power required to carry out the project.In this paper, based on HN power plant dust removal renovation project. First outlined the project and project management related theory, From the theory of engineering project risk management, Briefly describe the project risk management risk identification,risk evaluation,risk response. This paper introduces the current dust removal technology and the dust removal reconstruction in domestic power plant experience, Describes the HN power plant dust removal renovation project of basic situation, Elaborated the HN power plant electric precipitation reconstruction scheme selection and transformation way, And in the process of the implementation of the project, job content, workload is big, time limit is tight, high quality requirement and difficulty.Finally, this article based on the engineering project risk management theory, A brief overview of the HN power plant project risk management. By empirical judgment method and Delphi method of HN power plant dust removal renovation project risk identification and risk evaluation. By shifting risk, to reduce the risk, spread risk, to accept the risk,By adopting the method of personnel,machine,material,method,environment of a comprehensive measures, Formulated the HN power plant dust removal renovation project risk coping strategies, For researchers engaged in research on dust removal renovation project to provide the reference and reference.
Keywords/Search Tags:Engineering project, Dust Removal Transformation, Risk management
PDF Full Text Request
Related items