Font Size: a A A

Research On Project Management Based On The New Furnace For Brightness Line’s Project Of A Company

Posted on:2012-11-27Degree:MasterType:Thesis
Country:ChinaCandidate:Y D MaFull Text:PDF
GTID:2309330467478868Subject:Project management
Abstract/Summary:PDF Full Text Request
A company is a large-sized national enterprise, this paper is base on the Forth Furnace for brightness Line’s project from the A company. This paper is to research three contents of project management, include plan manage, cost manage and quality manage and to take available method for three contents and optimized ways. At the same time this paper has taken systemic project manage method. These can make project trouble-free and success. To use the theory and method can set a reference for further research.Firstly, the research background is based on the Forth Furnace for brightness Line’s project from the A company. This paper will look back the related theory of project management, after to introduce market demand analyze and technology path and equipment and key point of the Forth Furnace for brightness Line’s project; the total project condition and background are described.Following, to discuss process manage, cost manage and quality manage process can take improved scheme. Then to discuss several problem such as histology, plan, cost estimation, quality control will definite component duty, improve budget planning manage and build adjustment quality control, by using the project tools, such as WBS,OBS, milestone, progress graph, CBS.Finally the article have been formed the own point of view, Project manage is an art, it can change the world. The shortage of paper is discussed objectively.
Keywords/Search Tags:Furnace for brightness, Heat treatment, Project plan manage, Project costmanage, Project quality manage
PDF Full Text Request
Related items