Font Size: a A A

Research On Owner’s Risk Management Of Government Investment Project Under Agent Construction Model

Posted on:2016-12-06Degree:MasterType:Thesis
Country:ChinaCandidate:A Q JiangFull Text:PDF
GTID:2309330464974576Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
In recent years, In recent years, along with the implementation of the proactive fiscal policy to expand domestic demand and gradually increased investment in infrastructure construction, the government investment project has been drawing more and more attention from all circles of the society. Therefore, the current Chinese government primary consideration is how to ensure the efficient completion of government investment projects. The project’s efficiently completed mainly depends on how well the project management. Traditional project management mode adopted by the state of single investment, constructed by the government of franchise model, the government monopoly on public works projects. This result in low efficiency of project management, management confusion. In order to solve these problem, most part of country are actively implementing agent construction system. But the construction agent system is still in the early stages of development. Due to the imperfect of agent construction system in its mechanism and related system, many problems and potential risks are existing in the practice of agent construction. Therefore, the risks of government investment projects under agent construction model conduct a detailed analysis and established a more comprehension risk evaluation system. This is very important for strengthen the management of risk of agent construction projects.Based on the perspective of the owner of government investment projects under agent construction model, analyzed and evaluated its risks. Firstly, This essay has discussed the background and significance of the topic, described the main contents and technical route, etc. Secondly, this essay introduced the concept of government investment projects under agent construction model, analyzed the characteristics of government investment projects. Then combined with the existing risk management theory, the risk of the owner is divided into decision-making, management, politics, economics, engineering these five ares, and established the risk evaluation index system from the sources and features of the owner of government investment projects under agent construction model. Then this paper choose the analytic hierarchy process determined the various risk evaluation index weights and choose gray evaluation method determined the level of risk and established a evaluation system of the owner of government investment projects under agent construction model. Finally, this essay actual project case explained the application of these methods, got the risk factors weights of the project’s owner, evaluated the level of final risk, and put forward the risk response measures.
Keywords/Search Tags:Government Investment Project, Agent Construction Model, Risk Management, Gray Evaluation Method
PDF Full Text Request
Related items