Font Size: a A A

Study On Project Management Of Database Establishment About Core In Henan Geological Vocational School

Posted on:2017-01-16Degree:MasterType:Thesis
Country:ChinaCandidate:W S WangFull Text:PDF
GTID:2308330482984157Subject:Project management
Abstract/Summary:PDF Full Text Request
As a new management technology, Project Management was began in the late 19 th century and further develop and strengthen in the end of 20 th. Project Management is the management activities including project planning, project schedule, project maintenance, which means under a limited amount of resources conditions to utmost to achieve the desired goal, by using the related theory of knowledge, skills, tools and techniques to project activities in the scientific and reasonable forecast. Applied project management in software development project can guarantee the development progress to a great extent, by saving development cost and improve the quality and efficiency of software development. My research basis on the analysis for the core database of HD technical school, I hope the results will enlighten this kind of project management research.The paper had chosen the HD technical school as a case study, which is using the relevant theoretical knowledge of project management on HD technical core database project management case. The paper analyzes the main problems existing in the project as well as the causes of these problems. At the same time, the reasons for the problems are probed and some reasonable advice is given in this paper as well. The remaining problems include: 1. Project requirement analyzes is lack of communication. 2. Project quality management system is not standard. 3. Project database cost budget control is not enough. 4. Project database progress is lack of control. Based on the analysis of the pormblems and their cause,wesuggest some improvement measures in cluding: 1. Strengthen the teadership of the project group,promote the sease of responsibilities of the project group. 2. Strengthen the training work to improve the project group’s management tevel. 3. Optimize thecommunication me chanism of projects. 4. Optimize the management of the project guality and the standard process of the schednle management. 5. Establish the system of rewards and penalties in the super vision system. 6. Improne the project control ability of the persons in charge of the project.
Keywords/Search Tags:core database, project management, case study, communication
PDF Full Text Request
Related items