Design And Implementation Of Project Management System For Electric Power Plant Based On Case Reasoning

Posted on:2016-03-25Degree:MasterType:Thesis
Country:ChinaCandidate:L ZhangFull Text:PDF
GTID:2308330482456425Subject:Software engineering
Abstract/Summary:PDF Full Text Request
At present, in view of the special nature of their important role in the management of the national strategy development process power plant projects requires not only technically reasonable compliance, but also needs to achieve higher standards of efficiency and safety.However, with the rapid development of China’s electricity market, the state continues to increase investment in power industry infrastructure. Therefore the power plant project management problems will be more prominent, challenges will continue to increase. Constantly expansion of the electricity market brings the question that how to ensure the smooth progress of the projects is becoming a new problem to be solved, and how to design more scientific and effective project management system, and achieve better contract management is a challenge facing by the power industry.In this article, as for the fact that the huge gap existing between domestic MIS development and foreign countries’, we proposed a kind of management information system designed for instructors to manage engineering project: Case-based Engineering Project Management System in Power Grid. First of all, the article discusses the meaning and functions of the Engineering Project Management System. The current situation of the management for engineering project is also analyzed. It proposes that the corporate should establish the intelligent project management mechanism as soon as possible, by which to improve the efficiency and quality of the manager’s performance and security level, to ensure their safety and the orderly operation. Meanwhile, in the view of the project cases’ collecting, management, and the difficulty of using for the status quo, we put forward applying the case-based reasoning and communication technology to engineering project management system to achieve cluster management and efficient use of existing resources. Secondly, we analyze the status quo for case-based reasoning technology’s advantages and the extensive use of various decision support systems, which pointed out that the case-based reasoning technology’s application prospects in the engineering project managementsystem. Finally, we build up the support system including the functional design and code implementation. Because contract management is the core issue of project management,therefore this chapter mainly illustrates the design and implementation of the contract management applying case-based reasoning. The system will not only be able to upload the project case of the corporate to the database, but also can take advantage of network communication technology to achieve cooperation between companies by building a common database, in order to achieving the effective integration of resources. When the case-based reasoning method is integrated to engineering project management system, which based on cases in the database, we can retrieval and reuse to get a lot of options, so the administrator can handle emergencies and find solutions in a very short period of time. In the last, we summarize all the work we have done and propose the career prospect by the actual situation.
Keywords/Search Tags:Case-Based Reasoning, Engineering Project, Management System, Database Design
PDF Full Text Request
Related items