Font Size: a A A

Design And Realization On Coal Mine Intelligent Scheduling Conference System

Posted on:2016-10-17Degree:MasterType:Thesis
Country:ChinaCandidate:N N ChuFull Text:PDF
GTID:2308330482459266Subject:Computer technology
Abstract/Summary:PDF Full Text Request
In response to the rapidness, efficiency, development trend, the production efficiency of coal mine work has also greatly improve. Facing the highly effective production,it’s more and more important to complete the task allocation, timely communicate and deal with an emergency, at this time,the information transmission and timely, interactive communication become the primary issue. Coal mining scheduling conference is an important way to arranging for the work of production safety in the day and get all the work schedule, results and sovle the problems.Conference of traditional form greatly reduce management and work efficiency and even delay security processing time. At this point, the traditional form of the conference cannot have satisfied the working pattern of modern coal mine, so coal mine intelligent scheduling conference system has become inevitable.In this paper, through research and analysis the current situation of coal mine integrated informatization, conference system at home and abroad, taking shanxi LuAn group wangzhuang coal mine as the research object,and combined with the development of advanced technology, the development trend of coal mine management information system,it completes the needs analysis, feasibility analysis, the system overall design and detailed design, including System platform design,system development mode, database, data table and system function module, etc. By using the existing mature technology, ASP.NET technology and SQL Server database development technology, it developed the coal mine intelligent scheduling conference system based on the combination of B/S and C/S mode in the Visual Studio integrated development environment. This system can achieve the coal mine scheduling indoor and outdoor two scenarios of meeting the deployment and regular meeting of the functional modules. Scheduling outdoor scene mainly includes in the meeting, during the meeting, after the meeting three hours’ management work.And it can realize meeting management and the interaction between participants and man-machine interactive at the scene of the operation department.In this paper,it elaborated the design and the implementation process of the coal mine intelligent scheduling conference system based on the system analysis and design, key technology research and system implementation, and by using the common testing method such as black box testing test system. The implementation of the system greatly improves the management mode of modern coal mining operation department,and improves coal mining scheduling management efficient, intelligent, high degree of informatization, human-computer interaction, expansibility, environmental protection and repeatable usability and efficiency of dispatch meetings and class.
Keywords/Search Tags:coal mine schedule meetings, management information system, ASP.NET, B/S and C/S mode, man-machine interactive
PDF Full Text Request
Related items