Font Size: a A A

Design And Implimentation Of Hgcaob’smaterial Management System

Posted on:2015-05-16Degree:MasterType:Thesis
Country:ChinaCandidate:Y G YuFull Text:PDF
GTID:2308330473958188Subject:Software engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of society and the ever growing of business, the material managements in construction projects become more and more important to HEPC Grid Construction and Operation Branch. To meet the requirement of enhancing the management of materials, the company made a request for developing a material management system.The management system performs an all-round management through material requirements planning, contract signing, funds application, contract payment, material in-storage and delivery, contract enforcement, contract settlement with the statistical analysis of the implementation, and material equipment accounting querying, linked by construction projects and contracts. guide the user through data entry and query operations, maximize the material support of construction by providing effective information to the decision-makers. The target user of this system is mostly the staff involved in managing materials.The design of the system is to enable the approval process, contains the inventory, transfer, approval and settlement of contracts, through workflow technology. The system takes advantage of the powerful function of data import and export for data input and output. The powerful function of the system is capable of importing existing data from Excel into the system directly or forming a statistics report by export data from system to Excel in the format set by user. The B/S structure and Internet/Intranet technology were utilized for tele-working, and Object Oriented Analysis and Design(OOA&D) was applied to guarantee the normalization, portability, reliability and the developing efficiency of the system software and database. The system is of strong scalability by using Workflow technology, which can be adjusted by administrator according to the change of management content or the adjustment of departments and agencies. The application of We Service technology make the data exchange safety and stable. The use of Web document management technology associate the data with the document that bring them together as one.The design procedure of such a system is based on the principles of “Global Planning, User-Driven, Highly Customized and Phased Implementation”. The business model of system is divided into three levels, which are business level, management level and decision level. It can effectively control the correctness, validity and legitimacy of the business activities. The system index is powerful and can help users get the information they want. The system applications can exchange data with other systems of the company without barrier due to its cross-region and cross-system design.
Keywords/Search Tags:Material management, database, Workflow technology, extension
PDF Full Text Request
Related items