Font Size: a A A

The Design And Implementation Of Scheduling Order Management System For The Jinan Vehicles Section Of Jinan Railroad Bureau

Posted on:2015-04-27Degree:MasterType:Thesis
Country:ChinaCandidate:Y Q WuFull Text:PDF
GTID:2308330461992549Subject:Computer technology
Abstract/Summary:PDF Full Text Request
As the only vehicles section of Jinan Railroad Bureau, Jinan Vehicles Section bears all of work for verhauling more than 1,900 train cars. It has 11 workshops which distributed in Jinan, Qingdao, Yantai, Liaocheng, and most of production information between the workshops are transferred by the scheduling order. The scheduling order whether to be accurately and timely released and received is directly related to the train cars safe. But there are a lot of problems about the management and monitoring of the scheduling order:1. Orders are transferred through too many steps and too many ways. And if any one of them has a mistake, the safe of the train cars will be affected.2. You can’t control the mistakes, because you don’t know who make it.3. It is very difficult to inquiry and analyze the scheduling order. With the speed of the train is increased dramatically, the pressure of safe is also increased dramatically. So how to make a Management Specification of Scheduling Order is a question for Railroad’s safety.This system is mainly solving the problem of disadvantages of the current scheduling order. Provide a platform for the Management Specification of Scheduling Order for the vehicles sections of Railroad Bureau. This system is a typical management system which based on SQL Sever 2000 and Delphi7. The system is C/S mode, so that the client has more powerful ability to process the information. The system uses a variety of peripherals, and various forms to store data, so that the user can access a variety of information for one way.For close to the actual work, this system has a Information Management Module and a Pass Work Module. Because the scheduling workers believe they are two important parts of their work. It is import for a vehicles section to have a scheduling order management system, because for one hand, they need a standardized management system, for another hand, then need save the workload. So save the information to the computer is the only way of the railway development.
Keywords/Search Tags:Railroad, Scheduling Order, Management System
PDF Full Text Request
Related items