Font Size: a A A

Design And Implementation Of Resourse Management System In Portal

Posted on:2015-12-31Degree:MasterType:Thesis
Country:ChinaCandidate:P ZhangFull Text:PDF
GTID:2298330452961137Subject:Software engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of network and information technology, theinformation construction of CASIC has been deeply developed and widelyapplied to support the business expandation. However, due to the differentsystem platforms involved in different business application are independent,and the shares of information and data are difficult, the further progress of theinformation construction of CASIC has been hindered. To solve the"information island", to optimize system resource integration model, to provideusers with the clarity of information technology services have been the task oftop priority of the information construction of CASIC.Component Group portal system can effectively solve these problems.Through the Resource management, to Establish a unified organization’s portalsystem, and through single sign-on, access control model, role management,menu management and other functional modules to implement business processcustomization and organize data and other functions effectively. And the key isresource management.In this paper, author learned a large domestic and foreign literature andtechnical documentation on the basis of actual participated in project design anddevelopment work. By analyzing the Group’s underlying business, Combinedwith the knowledge of software engineering projects, author sort out thecomplete portal system requirements. And on this basis, to do the systemarchitecture design, module design, database design, to provide detailedtechnical solutions, and finally carried out code. System using object-orientedprogramming JAVA language developed using the Spring Framework and Webservice technologies, has good versatility and scalability.Currently, the portal system has been put into trial operation. System testresults are satisfactory.The Group’s business management level rose to a newlevel. In the next phase of work, the project team will continue to improve thesystem’s ease of use and flexibility, to expand the construction of group’sbusiness model and full-text search.
Keywords/Search Tags:Portal system, unified organization and user, resource managementPrivilege mode, Web Service
PDF Full Text Request
Related items