| During the usage stage of construction project, it would refer to a lot of operationmaintenance management for the construction equipment, the traditional way to is torecord device-equipment relevant information by each participant, the administrator hasto inquire each participant’s information, two dimensional drawing, documentsseparately to carry out specific maintenance work, it takes a lot time but still hard tomanage.This research has integrated applied the BIM and Access database, confluenceanalyzed the information needed for operating maintenance and the problems emergedin traditional construction equipment, as to build the construction equipment operatingmaintenance management visualized model based on BIM. By using BIM (BuildingInformation Modeling), based on the information sharing and visual display platformprovide by BIM, BIM module use the integrated equipment to inquiry and statisticinformation quickly,to research how to express visualization of equipment maintenancestate, contract state, cost overrun state etc.. To apply the Access database technology, onaccount of the exported data from BIM module, put in the specific contract information,cost information, equipment management department information, and employeeinformation, to establish a database for construction equipment operation maintenance,which could memory and manage the detailed information, realized the essentialinformation management of construction equipment, operation and maintenanceinformation, assemble unit management, contract management, cost management,supplier management, department information department, employee informationmanagement, realized the integrated management in the operation maintenance stage.Standing on the property operation manager’s point to put forward the visualmanagement mode and concrete implement progresses, clear and definite themanagement details for each participant, displayed the visualization performance andintegrated management for construction equipment by present cases simulate.BIM provide a data share platform, the managers could share the information ofeach participant, thus offered a convenient and rapid way to get information, realizedfast inquiry for equipment information, data statistics, saved a plenty time for manager,present a in time, simple and convenient, high-efficiency operation maintenance. Thedatabase of construction equipment enriched the equipment information, completed the manage function, could proceed a completely store and integrate management, so as toimprove the manage level of the construction equipment. The continuously updateinformation between BIM module and Access database realized the sustainablemanagement for the whole operation maintenance stage. It can be used for variousconstruction projects construction equipment operation maintenance and managementof the project, especially suitable for large, complex construction equipmentconstruction engineering quantity. It good to the people working for equipmentmanagement could have a better understanding of the equipment form, the equipmentspatial position, the essential information of the equipment, lower the professionalknowledge requirement for the equipment install map, as well as the difficulty ofequipment management, which made the equipment management more object and clear,simplified the fussy equipment management steps, help the manager to find out the keypoint, assistant in decision-making, realized the visualized management for theconstruct equipment. |