| In recent years, rapid development has become the new normal, In the development of Chinese civil aviation airport passenger throughput increase at the same time, the whole industry and even the society as a whole have been confused by a variety of causes large-area flight delays at the airport, the healthy, orderly and rapid development of Chinese civil aviation is limited by the larger. At the same time, the regulatory authorities in the treatment of large-area flight delays at the airport when facing situations and multifarious, not only involving range is big, long disposal, task division of miscellaneous, such as the problem of maximum stress is like a heavy burden on the industry regulator. Airport flight delays processing is not timely, not in place, the incomplete phenomenon emerge in endlessly, not only seriously affect the safe operation of the order of the civil aviation industry, the local government to the airport, airlines, airport has brought great negative impact. Airport should be as a social public infrastructure bring convenience for the masses, has evolved into a place for public emergency prone.After appeared in recent years this paper long water twice at the airport in kunming airport flight delays events:"on January3.2013incident" and "on December15,2013incident" in-depth analysis and research, from the system of "mechanism","running security" and "passenger service","air traffic security","airport construction" five aspects, such as comprehensive analysis and find the cause of the main causes of kunming long water international airport flight delays. Through the processing of kunming long water airport flight delays inspired work experience, put forward from the "clear airlines flight to run the main body of responsibility","clear work in disposal of flight delays at the airport the importance of the construction platform","way to optimize the spatial environment, improve the current air traffic control","strengthening the management of flight schedules, flight control running" four aspects, such as large-area flight delays of civil airport prevention countermeasures; Finally from the "sound related rules and management system, clear the airport flight delays the disposal of the rights and obligations of each responsibility main body","comprehensive combing, To establish a long-term mechanism of coordination and connection of large-area flight delays treatment "and" gradually improve the constraints on the work of flight delays treatment of punishment system "and so on three aspects, in the airport flight delays after effective rapid disposal of proposed solutions from the perspective of the whole system. |