| With the continuous expansion of the scale of the city, the growth of urban lighting facilities is increasing, which leads to the rapid rise in urban lighting. In order to achieve the goal of energy-saving emission reduction, carrying out urban lighting energy saving reform is urgent. However, the implementation of the contract energy management mode is still in the primary stage. The lack of comprehensive understanding of risk and the risk management of urban LED street lamp energy saving transformation project have not yet formed. Therefore, this paper puts forward the risk management and control for the urban LED street lamps, and constructs the risk identification, evaluation and control of the LED street lamp, which provides the experience for the risk management of city street lamp energy saving reconstruction project in our country.In this paper, according to the theory of safety risk management and safety risk control theory and the environment, operation mode, studies the risk management and control of LED street lamps energy saving reconstruction project.Firstly, this paper constructs the city LED street lamp energy saving reconstruction project’s risk evaluation index system through the result of risk identification and classification, which using the questionnaire survey method.Secondly, this paper puts forward the risk assessment model of urban LED street lamp energy saving reconstruction project through the comparison of the project evaluation methods and the characteristics of the risk of urban LED street lamp energy saving reconstruction project. The risk assessment model is constructed by using AHP and fuzzy mathematics.Thirdly, this paper achieves the risk control of urban LED street lamp energy saving reconstruction project from two aspects of risk response and risk monitoring. This paper expounds the risk response measures of urban LED street lamp energy saving reconstruction project, and has worked out the risk monitoring workflow process of urban LED street lamp energy saving project.Finally, this paper uses Beijing Changping District street lamp energy saving reconstruction project as an example to analyse, evaluate, and puts forward measures for the risk management and control. |