Font Size: a A A

Research On The Risk Management Of Housing Renovation Project Resettlement Jinzhong Tianjin Dongli District Sun Zhuangzi Street

Posted on:2016-11-07Degree:MasterType:Thesis
Country:ChinaCandidate:Y FengFull Text:PDF
GTID:2272330482964818Subject:Project management
Abstract/Summary:PDF Full Text Request
As a project of high investment, long time and difficult realization, the project is not only the risk of visible, such as management, financial risk, and the risk of policy change. Coexistence of multiple risks to real estate is full of uncertainty, especially in our country’s resettlement housing renovation project management is not mature enough, the market system is not perfect, but also the lack of effective laws and regulations as a guarantee and reference basis, which makes the placement of the housing reform project has unpredictable risk.This paper from the point of view of project management to research, reading a lot of literatures, summarize the domestic and foreign project risk control theory based on, take the combination of theoretical research and project research methods, through qualitative and quantitative combination of perspective, through the Dongli District of Tianjin Golden Street Sun Zhuang Zi resettlement room renovation project of project risk control measures. First of all, in Dongli District of Tianjin Golden Street Sun Zhuang Zi resettlement room renovation project risk control research background and significance, research status at home and abroad, this paper research contents and methods are summarized. Secondly, the engineering project risk control theory foundation is summarized. Third, Dongli District of Tianjin Jin Zhong Jie Sun Zhuang Zi resettlement room renovation project risk control status, on the one hand, provides an overview of the project developers and project overview, analysis of the running environment; on the other hand, Dongli District of Tianjin Golden Street Sun Zhuang Zi from the resettlement housing renovation project construction, project risk control requirements, project risk control method three aspects of Dongli District, Tianjin Jin Zhong Jie Sun Zhuang Zi resettlement room renovation project risk control status. Fourth, Dongli District, Tianjin Jin Zhong Jie Sun Zhuang Zi resettlement housing renovation project risk identification, based on project decision-making stage, the project preparation stage, the project implementation stage and project management to the project risk identification, and then puts forward the Dongli District of Tianjin Golden street sun Zhuang Zian real transformation of the project there is a project investment timing risk, project location selection risk, land purchase decision-making risk, schedule risk, marketing risks such as.Fifth, Dongli District, Tianjin Jin Zhong Jie Sun Zhuang Zi resettlement room renovation project risk evaluation, set the project risk evaluation index system and based on the qualitative analysis of the project risk factors based on. Finally, Dongli District of Tianjin Jin Zhong Jie Sun Zhuang Zi placement room renovation project risk control strategy, combining the project life cycle division, project risk control measures are proposed for project investment decision-making stage, the project development stage, the project construction stage, projects, rental and management of late stage.
Keywords/Search Tags:resettlement housing reconstruction project, project risk identification, risk assessment, risk control
PDF Full Text Request
Related items