Font Size: a A A

Research On The Optimization Of Manufacturing Management System Of New Generators In Harbin Electric Machinery Company Limited

Posted on:2017-01-19Degree:MasterType:Thesis
Country:ChinaCandidate:Y ZhangFull Text:PDF
GTID:2272330482988853Subject:Operational management
Abstract/Summary:PDF Full Text Request
"The new nuclear power generating unit is Harbin motor factory for new nuclear power generating units in Tianwan power plant design. The origin of the unit, in 2013, HEC Group, Hyundai and Tianwan Nuclear Power Plant signed a Tianwan 1# 2# machine stator and rotor transformation projects. In the early design of the project to be very simple, but in the original unit on the basis of transformation. Is different with the traditional transformation project Tianwan 1#, 2# units due to the previous design concept design concept and now has a very different, so Harbin Electrical Machinery Plant Co., Ltd. is actually to Tianwan nuclear power plant design and manufacture of new type units and units.Original manufacturing management system is no longer applicable to the overall situation in Harbin Electrical Machinery Plant Co., Ltd., the user of the product quality, delivery cycle, operation conditions and later service requirements higher. Therefore, it is necessary to carries on the improvement and optimization.In order to solve the above problems, Harbin electric motor factory limited liability company’s nuclear power generator manufacturing operation management system optimization, we introduce all kinds of world advanced design, preliminary analysis and final test method. To optimize the operation management system for the manufacturing, manufacturing, suppliers, customers and other aspects of the nuclear power generator.First introduced the APQP / FMEA design, to ensure that products meet the needs of the market in the production and sales process, risk prevention and risk assessment, and to minimize the risk of damage. From the design and production does not match the situation, as far as possible to eliminate the problem before production. From the beginning of the tender requirements, to the design department to draw the final blueprint, from design to manufacture the entire process of timely feedback of all kinds of problems. Ensure the final delivery date.Secondly, the use of business process reengineering to solve the problems encountered in the entire production process, re open up the idea of the original process to re use scientific methods to arrange. Business process reengineering approach to the industry to weaken the distinction, so that product manufacturing and sales of the various processes more reasonable. Do not need to delete programs and procedures, the layout of the work order is reasonable, simple to change the past, the method of rough work, weakening the interests of various departments, departments, to break the original working process of the motor factory.Once again, I use just in time production(JIT) to make the product meet the delivery date. In order to solve the problem that we implement the JIT production node delay, truly "big assembly pull small assembly, small assembly pull parts processing, in order to improve the parts manufacturers of coarse matching factory". Pull molding production to ensure the final delivery requirements. This will help the company to use the production management method, effective control design, manufacturing costs.Then increase the investment in fixed assets and total quality management, to ensure product quality. Using the wave of first article inspection quality control, changes due to other reasons, aided production of total quality management in the production process of the use of products and suppliers, to the quality classification. At the end of the general customer and important customer service level evaluation, the important customer feedback information for the first time to answer, enhance the company’s brand effect.After optimization, we also performed before and after the evaluation of the effectiveness of the system optimization.From the various data of the design and manufacture, operation method, production time, product quality, important customer set up, analysis and evaluation, in order to evaluate the quality of the product.
Keywords/Search Tags:operations management, new nuclear power generator, Management Optimization
PDF Full Text Request
Related items