Research On Risk Management Of 300000-Ton Annual-Output Feed Mill Construction Project In Mu Yi Company

Posted on:2016-01-09Degree:MasterType:Thesis
Country:ChinaCandidate:X G ZhangFull Text:PDF
GTID:2272330473954197Subject:Project management
Abstract/Summary:PDF Full Text Request
The development of risk management of construction project has high risk. Along with our country enterprise continued to increase investment in fixed assets, the development of these enterprises gradually aware of the fixed assets investment project risk management is necessary. Therefore, the study on risk management of construction projects is in order to reduce the cost of investment and the probability of risk. The goal of this paper is integrated use of theoretical knowledge of project management, using the theory and method of project risk management, the specific problems in the application of the theories and methods of project risk management are discussed in practice.The content of this paper is:firstly, elaborated on risk management in the project investment theory; secondly, in-depth analysis of the project background, necessity, construction condition, implementation progress and market situation; on this basis, to identify the various risks encountered in the project development process, to find out the impact of the main risk factors of the project development; and then use the uncertainty analysis of risk factors of each stage were evaluated; finally, in view of each risk, put forward risk treatment plan and monitoring measures, and the risk management of the project are summarized, prospect the future development of project risk management. This paper mainly uses literature reading and on-the-spot investigation, qualitative and quantitative analysis and specification.It draws the following conclusions:firstly, the main risk is an annual output of 300000 tons of feed factory construction projects in the investment decision-making stage is the financial risk, the financial feasibility assessment of the stage of the financial risk can be controlled. Secondly, an annual output of 300000 tons of feed factory construction project gets the main risk at the stage of land is the financing risk and land acquisition and resettlement of the original tenants of risk, risk assessment using the expert scoring method, the stage will be needed to focus on controlling the risks of financing risk and land acquisition and rehousing tenants risk, and puts forward the measures to control the risk of. Thirdly, the main risk is an annual output of 300000 tons of feed factory construction projects in the construction stage of construction period risk, is to bring the design change, construction condition and the risk of price changes and other aspects of the cost risk, personnel quality, material quality and construction technology brings quality risk, using expert scoring method for risk assessment, the stage to perform focus on controlling the risks of the delay in the schedule,design changes,the quality is not up to the requirements, and puts forward the risk control.
Keywords/Search Tags:Factory construction project, Project management, Risk management, An annual output of 300000 tons of feed factory
PDF Full Text Request
Related items