This article through to the Zhejiang Zhan Cheng construction group Limited byShare Ltd has built the basis of practical engineering, materials Zhejiang San Shigroup Jiaxing India Cements Limited to build2000000tons of cement grindingproduction line project, based on the case of engineering and construction schemecombined with the sliding formwork construction technology principles are analyzed,and the construction process quality control points were discussed in detail.Elaboratedin cement silo construction slip-form construction process using scaffolding steel pipeinstallation of flexible platform construction method, and compared with theconventional construction methods, construction technology with high speed, cansave the formwork and scaffolding required quantity, can conveniently make thetemplate in form and flexible assembly and repeated use.The slipform constructionsteel production installation, supporting rod installation, concrete pouring, sliding andprecision control of process quality control are described in detail, reveals in theslip-form construction process should pay attention to the quality control points,control measures and quality problems should take corresponding measures. |