Font Size: a A A

Improvement On The Quality Management Of The One Hundred Thousand Ton / Year Lead Smelting Project Of Chifeng Mountain Gold And Silver Lead Company

Posted on:2017-05-02Degree:MasterType:Thesis
Country:ChinaCandidate:Y J SunFull Text:PDF
GTID:2271330482488892Subject:Quality Control
Abstract/Summary:PDF Full Text Request
The quality of the project can be said to some extent, is the core content of project construction, fully embodies the economic benefit and the core interests of investment enterprises, the quality of the projects, quality management measures are not in place, will inevitably lead to the cost of raw materials, machinery and equipment costs, labor costs increase, the project production line and product service life will also be affected, invisible to the country and society has caused great waste of resources and loss of property, which in the objective conditions of the project manufacturing enterprise project quality management has put forward higher requirements, need to be invested enterprises in the project implementation process must be optimized to enhance project quality management on the first place. Take measures to advance the quality management of quality improvement measures, provide a good soft environment for the healthy development of enterprises.This paper is divided into four chapters in the Chifeng mountains of gold and silver lead company one hundred thousand tons / year lead smelting project quality management improvement measures, the introduction of the background of the writing of one hundred thousand tons of lead smelting projects are briefly introduced and discussed the practical significance of the project quality management improvement, and the research status at home and abroad and the related theory of quality management are described; then discusses the basic situation of one hundred thousand tons of lead smelting projects and the project quality management related briefly, expounds the concrete problems existing in the project quality management; then analyzes the one hundred thousand tons of lead smelting projects is the cause of the problem in terms of quality management, analysis theory and the principle of quality supervision the theory of guarantee theory, PDCA cycle theory, control theory, the integrated use of quality system, with the overall concept Concept and system of project quality management of comprehensive analysis of all aspects of strengthening project planning, implementation, inspection and processing quality improvement, implementing the whole process control, and the construction project implementation of a full range of supervision, and puts forward some concrete measures for the improvement of 1 00000 tons / year of lead smelting project quality management in the project construction, and product production process. Through this paper, hoping to nonferrous metal enterprises in Bahrain city in the banner of Chifeng to improve project quality management work provide some reference, lead nonferrous metal enterprises to improve project quality management as an effective way to meet the non-ferrous metal industry market downturn, more hope that through this, let more related or similar enterprises and improvement to pay more attention to enhance the quality of the projects, and through reasonable adjustment of high value-added products production, research on mixed ore processing technology, continuously reduce costs, seek new profit growth point, gradually reduced due to the adverse effects of the current non-ferrous metal market low price brings to the enterprise.To sum up, this paper from the actual situation of Chifeng City mountain gold and silver lead Co., Ltd. 1 00000 tons / year lead smelting project of describes the lead smelting project general situation and quality management current situation and existing problems, deeply revealing the existence problem of bottleneck constraints, because system should be pointed out that the clear project quality management improvement measures. The analysis and discussion of this paper also has a good reference value and reference value for other enterprises and similar project engineering quality management. I also very much look forward to through the writing of this paper to Chifeng City, the healthy development of the nonferrous metal industry, baarin Left Banner, and the county’s economic and social steady and rapid development, as a humble yourself.
Keywords/Search Tags:Lead smelting project, Quality Assurance, Quality Control, Improvement
PDF Full Text Request
Related items