| The twenty-first century, with the progress of society, the demand for oil is increasing social life large supply of oil for oil companies is increasing, oil companies on technical requirements are getting higher and higher, as oil joint station crude oil processing unit,plays in the oil supply very important role in the process, but at this stage of the joint supervisory control work stations each process, has shown signs of backwardness, it is difficult to meet the needs of normal production run, based on this case ten apricot Labour union Station project started centralized monitoring system, centralized monitoring system is a computer network based on digital control system, this system can stop all production processes combined seamlessly monitor and control processes, centralized monitoring the implementation of this project is to a typical project management, the successful implementation of this project can improve the apricot-fifth of a joint station automation of the production process, ensure safety in production, lower operating costs, more rational and efficient process for the joint supervision of the production station control and improve supervisory control efficiency.Focus on monitoring the implementation of the project is a typical project management,the successful implementation of this project can improve the apricot fifteen- Union Station level of automation of the production process, ensure safety in production, lower operating costs, more rational and efficient joint stand on each supervise the production process control, improve operational efficiency. According to the paper apricot fifteen- Union Station implement features centralized monitoring system project, learn modern project quality control theory, a detailed analysis of apricot fifteen- the specific work station joint centralized monitoring project implementation management. This paper first describes the background, purpose and significance of this project, describes the project quality control theory and its development, and then analyzes centralized monitoring project status apricot fifteen a joint station, the problems on the basis of fifteen of apricot- participation in the quality of personnel, quality monitoring equipment, project implementation â…° joint project of the central monitoring station mechanical equipment, process methods, project implementation and environmental factors with in-depth analysis, project quality evaluation model was constructed, and the evaluation results are analyzed. Determined on the basis of fifteen apricot Union Station centralized monitoring project quality control guidelines, jointly developed principles of centralized monitoring station project quality control, quality control of concrete measures proposed project. |