Font Size: a A A

Project Post Evaluation Method And Application Of "Skynet" Project In FSK Area

Posted on:2014-07-27Degree:MasterType:Thesis
Country:ChinaCandidate:Y T JiaFull Text:PDF
GTID:2268330425968231Subject:Business administration
Abstract/Summary:PDF Full Text Request
As the economy of the society is growing at a fast pace, people are becoming moreand more concerned about whether the construction and running of publc facilities cankeep up with the fast development. Being pushed by these growing demands, localgovernments keep on bringing the constructions and operation to a higher level, as wellas pay much more attention to their effencicy.In the light of the mature projectmanagement system and the characteristics of public basic facilities, all govermentsdecide to apply the methodology of project post evaluation in more and moreeffenciency appraisals of public facilities. In this way, they can have a clear view aboutthe whole project to see if it’s been practical, and to check any protential problems aswell as gainning experiences from the past.With the support of fast developmint information and cyber technology, as animportant project of security and defence technology,"Skynet" visual supervisionsystem plays a big role in the conscturcion of "Safe city" and "Intellegence city".Skynet makes huge contributions in aspects of supervising the society, keeping the cityin order, surpressing the crime and helping to detect the criminals.In this essay, a projectpost evaluation will be applied to audit the socialy security facility project "Skynet".According to the4principles of integrety, feasibility, pertinency and realizabilitystated in the methodology of project post evaluation, a relavant indicator system will beestabliblished based on the characteristics of "Skynet" in FSK area. Meanwhile anintegrate vague analytical method based on level analysis will be used to emphasis oneach different indicator.After that an questionnaire survey will be carried out based onthis project post evaluation indicator system to analyze the funding, planing,construction,acceptance run off and the management of the first "Skynet" project inFSK area. Thus a good understanding of the whole project will be created to reveal theproblems in the construction and operation period and useful suggestions will be madefor the reference of the construction of the second "Skynet" project in the area.
Keywords/Search Tags:Skynet project, Project Post Evaluation, Fuzzy Synthetic Evaluation, Indicator System
PDF Full Text Request
Related items