Font Size: a A A

The Study On The Disaster Recovery System Construction Project Of The Liaoning Province Branch Of The Industrial And Commercial Bank Of China

Posted on:2014-11-11Degree:MasterType:Thesis
Country:ChinaCandidate:X WangFull Text:PDF
GTID:2268330425965329Subject:Project management
Abstract/Summary:PDF Full Text Request
With the constant improvement of the banking industry information disaster recovery isbecoming more and more important, the existing data center in Industrial and CommercialBank of China can’t meet the needs of growing business, In order to ensure efficientoperations of the bank, it is urgently to weigh the costs and benefits and project risk, ensurethe security of information system make the risk is reduced to the lowest priority of the bank.The best way is to build a new data center which is larger, having more facilities and saferthan before, and on this basis to establish disaster recovery in Shenyang and Dalianrespectively three center architecture system.In this paper, based on the relevant theory of cost management theory, mainly expoundscost management. in the process of building the disaster recovery system. In order to ensurethe predetermined budget to complete the project, specific project cost management processto implement the four steps, namely, make the cost management plan, cost estimation,determine the cost budget, implementation of cost control, the four steps no obviousboundaries often need to cross Through the project management team after a disasterrecovery system project with the first detailed investigation, using the method of reasonabletool, make accurate detailed cost plan. Emphasis given to those who are easy to be ignoredof indirect costs, identify and analyze the cost components, estimates various alternative costand the ratio between the cost and coordination cost, master analysis methods and costbudget. Provide a corresponding project cost model for the bank to build disaster recoverysystem, realize the bank system in low cost and fast recovery after a disaster, and overallimprove the quality and efficiency of system project deliverable, improve the corecompetitiveness of the Industrial and Commercial Bank of Liaoning branch, provide atheoretical basis and recommendations to similar projects in the future.
Keywords/Search Tags:Disaster recovery system, Project management, Cost plan
PDF Full Text Request
Related items