M College Student Apartments"Access Control System"Installation Project Schedule Management And Its Evaluation Abstract

Posted on:2014-07-02Degree:MasterType:Thesis
Country:ChinaCandidate:S C SunFull Text:PDF
GTID:2268330401484376Subject:Project management
Abstract/Summary:PDF Full Text Request
The successful implementation of the basic and important factor is the project schedule control to a project, it is always attach great importance to the problems in project management. It is the key to the success of the project, to the benefit of. However, in the actual project management, schedule control theory is the schedule management of a main part is very important, it has been widely used and plays an important role. Study on schedule control theory provides theoretical reference for enterprises to effectively control the progress of project, and use the project schedule control the cost and quality control of the project objective. The project schedule control about the theory of the efficient use of the engineering construction, better able to guide the engineering progress schedule, ensure that the project can be completed on time. Based on the project management theory and related research, summarizes the content includes schedule management theory, method and effect of application in project management.The student apartment management school of M access control system installation engineering project as the research object, research on how to put the theory and technology, methods of project schedule control to the project schedule control plan and use of all aspects of it, very good to achieve the project schedule control in solving many problems in operation of the project objective. Structure of this thesis firstly explains the basic principles of project management and schedule control, preparation and implementation and other related theoretical method and schedule. Then, the thesis also explains the preparatory work of the project progress control, focuses on the overview of the project, work breakdown structure, project organization settings and various functions of planning and schedule control, various requirements. Then, the detailed process of the project schedule control, schedule control procedure and method through the two aspects of the overall project schedule control scheme, explain in detail the system project schedule and schedule. Finally, the relevant theory of fuzzy comprehensive evaluation based on the analytic hierarchy process in fuzzy mathematics, on the evaluation index system is given a comprehensive evaluation, and contact the project case gives the evaluation process of the whole.
Keywords/Search Tags:schedule control of network planning, AHP-fuzzy evaluation
PDF Full Text Request
Related items