Font Size: a A A

Research And Evaluation On Project Management Of Emergency Onitor System Project Of Chemical District In Guangzhou Iaohu Island

Posted on:2014-10-03Degree:MasterType:Thesis
Country:ChinaCandidate:K W ZhuFull Text:PDF
GTID:2252330422455155Subject:Project management
Abstract/Summary:PDF Full Text Request
With the great development of our ecomomy and technology, the formation ofelectromechanical installation has been enormously expended, the system becomes more andmore complicated the cost of building increased appantly and the difficulty of managementalso promoted. Because of the large amount of profession content, the complicated system,the complex constitution of costing, it is completely difficult to control the costingeffectively in electromechanical installation enterprise. At the same time, theelectromechanical installation has special properties, the space of costing and profits arerelatively big than other project enterprises. With the increasing development and research ofmanagement level in company, the theories and methods of project management are used inelectromechanical installation programs, but there is a great gap in the theory of modernproject management between inland and foreign. So it is significant to improve thecompetitiveness power of the enterprise by solving the practical problems appeared in theeveryday operation and management.This paper is major researched on the project management of Chemical strictemergency monitor system. On this basis, the general situation and structure is firstlyanalyzed. In order to make the project can be finished in high effect, safety, the articleemphasize on the management methods and technical measures of the organization structureand the control of quality, plan and costing. The other elements of project management, suchas information management, safety management, environmental management and civilizedconstruction, risk management, are also analyzed. Moreover, the index system of project management effect is carried up, also the multi-level fuzzy comprehensive evaluation isadopted to evaluate the project management effect in the electromechanical installationproject, the finically evaluation result for the chemic strict emergency monitor system projectis “high”.
Keywords/Search Tags:electromechanical installation enterprise, project management element, organization structure, multi-level fuzzy comprehensive evaluation
PDF Full Text Request
Related items