The Research On Risk Management Of Xinhua Pharmaceutical Five Ammonia Removal Project

Posted on:2014-04-21Degree:MasterType:Thesis
Country:ChinaCandidate:X J JiaoFull Text:PDF
GTID:2251330401483740Subject:Project management
Abstract/Summary:PDF Full Text Request
The land resources tension, serious environmental pollution, energy crisis has been increasing, at the expense of the environment and resources at the expense of the social development model has become influence the human society sustainable development the important problem of green engineering projects in the circular economy under the requirements of the development of put on an unprecedented level, but green engineering and traditional engineering has unique characteristics, this the project management has also put forward new requirements.Risk management is an important part of project management, In order to realize the green engineering project management, according to Xinhua Pharmaceutical five ammonia removal of this specific project, risk identification, assessment of the project life cycle, formulate measures and supervise the implementation.The main content of:First, based on the five ammonia removal project green orientation, to the project quality, schedule, cost three traditional goal of development, increase the safety, the satisfaction and green, three new target, the establishment of the target system of the project, so as to the realization of the goal of risk analysis and discussion of a more comprehensive.Then, on the basis of risk management theory, the types of risk life cycle five ammonia removal project, are risk identification, risk assessment, risk response and risk control. Specifically, at the risk identification stage, after analyzing the advantages and disadvantages of various methods of risk identification and the scope of application, reasonable selection of WBS-RBS recognition matrix method all risks five ammonia removal project; At the risk assessment phase, using the analytic hierarchy process to evaluate the identified risks, and according to the ABC classification of risk classification in line, so as to determine the risk indicators of risk in the high, low level of risk, the important degree; At the risk response stage, focus on a risk in the6risk analysis and formulate the corresponding risk countermeasures; At the risk control staue, in order to control the risk of the information svstem as the means to achieve organizational structure, organizational guarantee, should establish the risk early warning system, develop risk emergency plan. Finally, summarized the whole research process of risk management, draws the conclusion and deficiency, point out the direction of future research.This paper is the application of risk management theory to attempt to specific projects, organization and management for the implementation of the project put forward suggestions about data accumulation, in order for the future project management services, exploration but also on the project risk management theory to make a meaningful.
Keywords/Search Tags:The relocation of enterprises, Xinhua Pharmaceutical, greenengineering, project management, risk management
PDF Full Text Request
Related items