| With the rapid development of C Company these years, the low rate of product achievement of the injection-molding workshop is more obvious. How to improve the product achievement rate of the injection-molding workshop is a serious problem that C Company is facing. This thesis takes the injection-molding workshop of C Company as the study subject, makes a study of how to raise the product achievement rate, and poses the solutions by means of Single Minute Exchange of Die and Balanced Manufacturing. The following are the main contents of the thesis.1. expounding the background and significance of the study, reviewing the application of Lean Production at home and abroad, and pointing out the main study of the thesis.2. describing the injection-molding workshop and its existing problems, analyzing the gap between practical and theoretical production capacity and the reason of low rate of product achievement, and fixing the sub-items need improving.3. representing the exchange of die and its problems, putting forward the scheme of injection-molding die exchange by promoting the Single Minute Exchange of Die, and making an evaluation of its effect.4. analyzing the problems of the production planning according to the low rate of product achievement, suggesting the adoption of Balanced Manufacturing, and posing master and batch production planning and production controlling.5. making a conclusion of the thesis, and proposing an assumption of further studies. |