It is known that China is rich in water resource, thus developing hydroelectricity is takento be an important policy in the energy development. Instruction in the N0.1Documentsmentions that we should reverse the condition of the absolute lag development ofhydroelectricity completely with5to10year’s effort; we should increase the input of waterconservancy in the public finance expenditure, raise money in various ways, and spare noeffort to make the average annual investment in water conservancy in the following10yearsdouble of it in2010. Development of hydroelectricity will obviously bring a mass of landexpropriation and resettlement, which will become more and more with the development ofthe construction and social economy, so will the tasks in this field, and the percentage of theinvestment for land expropriation and resettlement compensation will increase in the wholeconstruction project cost. Nowadays, land expropriation and resettlement turns to be the keypoint of the hydraulic and hydroelectric project. The core to precede successful landexpropriation and resettlement is reasonable control and management of the investment ofland expropriation and resettlement. Given the reality of the investment management, andthrough deep analysis of the problems and related factors and investigation of systems andmethods of the fund management, to establish a perfect investment management system is ofgreat theory and practice value.With the development of the hydraulic and hydroelectric project in our country, themanagement system of project management is going to be mature, all parts in the projectrealize more about the project investment control, forming the theory of the wholeprocess-investment control. As the key point of the project, although the land expropriationand resettlement has established a mature fund management system and methods, anddecrease the risk of fund payment step, the risks of land expropriation and resettlementinvestment is not decreased successfully. Therefore, the article by drawing on the wholeprocess-investment control theory of the engineering construction, combined with thecharacteristics of the land expropriation and resettlement, through the analysis of investment control vital points in land expropriation and resettlement design stage, implementation stageand the final acceptance stage, to explore the investment control methods of the various stagesin the theory, establishing investment control system the land expropriation and resettlement,in order to achieve the investment control objectives. The article take the middle route Zsection project of South-to-North Water Diversion as an example, through the analysis of thenational approval of general investment, to find out the main dynamic factor that influence theland expropriation and resettlement investment, combining with the investment control theoryof the land expropriation and resettlement, describing the investment control content and thespecific methods of the Z section design phase, implementation stage and the final acceptancephase, in order to achieve the effective control of the investment on land expropriation andresettlement, and assure the smooth conduction of the project construction. |