| Today, the international shipping market is affected by the financial crisis; theship price is getting lower and lower. The shipbuilding industry is facing downturnright now. The shipbuilding companies are taking steps to get orders, For example,reducing shipbuilding cycle, reducing single-vessel-sharing space, equipment, toolingand other costs, accelerate cash flow, increase the efficiency of enterprises. In order toreduce business risk, management and researchers become another important area ofconcern.In this thesis, we commence the research from the construction of our Company’sHandy-max product tankers, first introduced the background of the study, this studyproposed a method to study the significance of ideas and to explain the model ofmodern shipbuilding and the first shipbuilding modernization theory, TOC Theory ofConstraints, LP (lean production) of the product value chain analysis, pull system, JITproduction and Built—in Quality, accuracy control of shipbuilding, andrelated theories.On this basis, the paper analyzes the status of process control during GuangzhouShipyard International Handy-max product tanker construction. Firstly, show andanalyze the main building process control of the Handy-max product tankersconstruction by graphs, then, describes and analyzes the main methods of the processcontrol in the Handy-max product tanker construction, and then presents the mainissues currently need to improve.Finally, discusses the improvement program of process control of theHandy-max product tankers construction. proposed the establishment of the "intermediate product" as the operating system-oriented production, the establishmentof construction planning system for continuous improvement of constructiontechniques and the formation of improved standardization, discussed establishstandard with a plan and pull system and how to build the Handy-max product tankersaccuracy control system. |