Font Size: a A A

Applied Research On The Requirement Risk Assessment Of Embedded System Project

Posted on:2013-07-01Degree:MasterType:Thesis
Country:ChinaCandidate:M HuangFull Text:PDF
GTID:2248330395475720Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
In recent years, the technology of embeded system is developing fast and embeddedproducts appear in many fields. Because the Uniqueness and Uncertainty which exists int thedeveloping period of embeded system, Assessment of risk of embeded system project hasbecome a difficult and important problem. Inside the Project development cycle, the earlierto frind where the problem is, the better to reduce the project cost. Requirements phase is theearlist phase in the project development cycle, if we can asses the risk in the requirementsphase,and take measures to avoid this risk,that sholud provide great Guarantee about finishthe project on time. However, Specify method to asses the requirements rist in this days, isstill inadequate, The way to Comprehensively assese the rist of requirements in embededsystem project need further research.This dissertation intuoduced the development features and process, discussed the resonof requirements rist and its Multiplier effect. On the face of project delays problems whichcaused by requirements on certain develop enviroment, this dissertation built the indicatorsystem of requirements analysis risk, further more, this article find a requirements rist assesmethod which based on fuzzy Analytic Hierarchy Process. On the last Chapter, tis dissertationuse the research and method in the real operation of a Aimer37project from a company,which verified the Practicality of the the indicator system and method,...
Keywords/Search Tags:Embeded System, Requirements risk, Indicator System, Risk assessment
PDF Full Text Request
Related items