Font Size: a A A

A Thesis Submitted To University Of Lectronic Science And Technology F China

Posted on:2013-05-20Degree:MasterType:Thesis
Country:ChinaCandidate:C LiFull Text:PDF
GTID:2248330395474233Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Along with our country the rapid development of power grids, power productionsafety training mode has become one of the most social power enterprise demand,deepen national grid system construction important carrier, but also the various powercompanies to implement the CPC Central Committee General Office of the StateCouncil," Guan Yujin step to strengthen the power of the work of production safetyadvice " spirit and national grid related departments about " national power grid securityand prepare meeting " video conference spirit of the specific initiatives.The major Power Grid Corp relies on IT technology change with each passing dayand combined with the current rapid development of the network information platform,perfecting the construction of fast, efficient information management system in business,and standardization of the premise, make full use of computer network and informationresources, the establishment of a cover of Pixian power Supply Bureau assets operationsupervision and analysis, asset evaluation and maintenance, security and surveillance,command and coordination of various segments, unified, centralized, specification,controllable, coordinating the operation of the power production safety managementintegrated information platform, for the electric power production safety and economicoperation of power network to provide timely, accurate, comprehensive managementmeans and tools, improve the safe production of electric power enterprise managementlevel and management quality for the safe production of electric power, providedecision-making support.Power supply company’s database is the core resource of power company MIS, theplanning and construction of basic database related to power company MIS constructionlevel. Therefore, safe production of power company MIS as an important managementinformation system, database selection principle should follow the MIS system databaseselection criteria, each business unit is the power production safety management systemis an important component of, but also a difficulty.
Keywords/Search Tags:power management system for ASP.NET, SQL SERVER2005, softwareengineering
PDF Full Text Request
Related items