Font Size: a A A

Design And Implementation Of Electric Power Bureau Dedicated Fnancial Management System

Posted on:2014-10-03Degree:MasterType:Thesis
Country:ChinaCandidate:H L WangFull Text:PDF
GTID:2298330431965553Subject:Software engineering
Abstract/Summary:PDF Full Text Request
As Electric Power Bureau, its financial records is confused and varied. Thepreviously common approach uses the information systems to deal with ElectricPower Bureau books information, income and expenses information, reportsinformation etc. It is time-consuming, so it needs develop special financialmanagement to accelerate information processing speed and improve managementefficiency, thereby promoting the sound development of the financial situation ofElectric Power Bureau.The paper uses.NET platform technology to achieve special financialmanagement system, which can achieve special management financial information ofElectric Power Bureau.The system is based on C/S architecture combined with SQLServer2005database technology, it is mainly for the special status of Electric PowerBureau.The financial management is divided into log management, customerinformation management, management books, project management, payments,reporting unified main functional blocks. The requirements analysis, design andimplementation process uses use case diagrams, system flowcharts, database ERdiagrams described tool.Combined with the status of Electric Power Bureau, it designs and completes aspecial financial management system of Power Administration. The current system isbeing functional testing and other aspects of the test, the results system meets theinitial design requirements.
Keywords/Search Tags:Dedicated Financial Management, .NET, C/S, SQL Server2005
PDF Full Text Request
Related items