Font Size: a A A

The Research For Design Flow Of A Brand Auto Manufacture Expansion Project

Posted on:2013-05-02Degree:MasterType:Thesis
Country:ChinaCandidate:J MuFull Text:PDF
GTID:2232330392453204Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
The architectural design for our country is gained sple ndid achievements during60years socialist construction. Especially after reforming and opening to the outsideworld, with econom ic growth and social pr ogress, construction industry is growingvigorously. The industrial architecture wa s proud to display its new im ages. Theamount and quality of industrial architectu re is increased fast. W ith constructionindustry high speed g rowth, the ind ustrial architecture is changed with each passingday, The key of the industrial architectural design is completely design flow. We mustresearch the custom er requirements, brands and m arket targeting. Provide first-rateservice and innovative products to custom er. New project contains four steps whichare decision, starting, judgment and carrying out. The controlling and following up ofthe design flow is important to the all procedures for the project.The article chooses the research of indus trial architectural de sign flow as startpoint. First introduce the basic theory of industrial architectural design flow designingand collaborative design. Build design fl ow OA application m odel for industrialarchitectural design flow. Validation model is the research for design flow of A Brandauto m anufacture expansion project. Th rough com parative analysis, testify thesuperiority of the new flow model for all new building design to tradition flow m ode.It can meet the modern industrial architecture requirements which are high ef ficient,high quality and high require. As the same time the article raise the concept for BIM(Building Information Modeling). Give an outlook on the design flow developmenttendency.
Keywords/Search Tags:Design Flow, Collaborative Design, Industrial Building, BIM
PDF Full Text Request
Related items