Font Size: a A A

Wy Group To Improve The Quality Of Plastic Mold Manufacturing And Shorten The Manufacturing Cycle

Posted on:2007-08-22Degree:MasterType:Thesis
Country:ChinaCandidate:B ChenFull Text:PDF
GTID:2209360212986647Subject:Business Administration
Abstract/Summary:PDF Full Text Request
The Concurrent Engineering is the integration and parallel design the different processes (consisting of produce process and the support process) systems method.Concurrent Engineering promoting design face to manufacture , to the fitting , to the full process of produce manufacture with entire life cycle . Implement the Concurrent Engineering in the enterprise , and is favor of lifting enterprise production efficiency , and carries forward the enterprise technique development and speeds up the establishment that the system of modernize administered , and is favor of lifting enterprise core contest force , and is favor of the enterprise to go away the cooperative way of internationalThe sign ó is the concept in the statistical field. It can be defined as standard difference in normal distribution. Six sigma can be understood as six time's standard difference. In quality, it can be described that the opportunities of faults per one million times or the no prefect quantities in one million products only appear 3. 4 times. In fact, six sigma administrator not only can be pointed to the quality of products, but also be a system theory of management and practice methed. the core idea of six sigma management can be pointed to a quality standard, and can represent a new idea of management more. It requires the enterprise continuously pursuing the nearly perfect products and service quality.In order to achieve the operation goal that reducing the mold made circle time and promoting the quality of mold, The thesis based the theory and method of concurrent engineering, on the base of completely investigated to the producing and operating, combined the practice of produce, research reducing the mold made circle time by the method of CE, controlling the work flow to improve the quality of mold by the tool of 6ó management, changed the drop behind situation of management. Provided the theory and method for the implementation of projects.
Keywords/Search Tags:mold, Concurrent Engineering, Project team, Sixó, FMEA
PDF Full Text Request
Related items