Font Size: a A A

Based On Cmmi Project Monitoring And Control Process

Posted on:2007-10-27Degree:MasterType:Thesis
Country:ChinaCandidate:J ShenFull Text:PDF
GTID:2208360215998643Subject:Software engineering
Abstract/Summary:PDF Full Text Request
With the popularization of Software process improvement, there are more and moreargumentations about it in software industry. These argumentations most focus on thechoice of the improvement model or the means of the improvement. With CMMIspreading in the most countries and areas, more and more attentions are paid on it.Since many years ago, my company is working on large electronic information system. Weneed canonical process management because these projects deal with many technologyworks such as requirement design, system frame design, hardware/software design,equipment stock, hardware/software development, system integration, system testing andetc. In 2005, my company passed CMMI L2 authentication. Project management is undermanagement, control and assess. And now, we already have CMMI L3 authentication inNov 2006.The article introduces the structure of CMMI, and discusses how to apply processimprovement based on CMMI L3. I consider that the work of project monitoring andcontrol is very important and heavy. So in this article, I analyze the working flow, ofproject monitoring and control, and at last introduce the design think and the application ofthe project management system.
Keywords/Search Tags:CMMI, Software process improvement, Project monitoring and control
PDF Full Text Request
Related items