Font Size: a A A

Research And Analysis On Reliability Testing Management System Of Shenzhen Institute Of Metrology And Quality Inspection

Posted on:2016-03-14Degree:MasterType:Thesis
Country:ChinaCandidate:C W ZhangFull Text:PDF
GTID:2208330470954696Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Paper based on the current third party lab lack for the use of professional department office management system present situation, development and design for the use of reliability test lab management system. Reliability test management system management system is a collection of business acceptance, sample management, testing management, standard management, report management and query management functions for the integration of management system. This system has realized the laboratory resources reasonable use and arrangement shorten the test cycle, greatly improve the efficiency of test arrangements and equipment efficiency. Reliability test by way of procedural and standardized administration management system, make the test from beginning to end is simple, scientific and orderly manner.Paper first introduces the research background for reliability test lab management system of Shenzhen Academy of Metrology and Quality Inspection, description of the current system of defects and deficiencies, discussed the research significance of the project. In business analysis, the paper on the problems existing in the system, organization, the original business process are analyzed, and gives a modified business process; In functional analysis, the paper through the case analysis and the use case description, clear the system function, gives the system’s overall function package diagram and the subfunction package diagram, including business acceptance, sample management, contract management, testing management, report management, report change management, records management, standard management and query package diagram; In data analysis, the paper on the system each function of the need to deal with the data was analyzed, create a database table structure and depicts the entity class diagrams. Finally, I finished work is summarized, points out that the system still need to solve and the existing problems and the focus of the next step work.
Keywords/Search Tags:Reliability Test Management, Information system, Requirements modeling
PDF Full Text Request
Related items