Font Size: a A A

The Technical Economic Analysis And Esrimation Of 110kV Electric Transmission And Transformation Project In Hebi Shigang

Posted on:2011-04-20Degree:MasterType:Thesis
Country:ChinaCandidate:A J PanFull Text:PDF
GTID:2189360305952729Subject:Project management
Abstract/Summary:PDF Full Text Request
Power grid construction project is the country's basic construction projects, which has practical significance to China's socio-economic development. The power project's construction project is reasonably necessary to carry out technical and economic evaluation. By Hebi and Qi County's economic profile, the profile of power system analysis, argument Hebi Shek 110kV power transmission project construction projects necessary to sex. Secondly, this paper researches from the low grade, the scale of construction design, site selection analysis, and comparative analysis of the project-building programs to determine a technically feasible options; from profitability and solvency in the project's economic feasibility study. Finally, the application of integrated evaluation methods, the project conducted a technology assessment and economic evaluation of projects were set up power transmission technology assessment and economic evaluation index system, through the empirical analysis further demonstrate the feasibility of the project. This study can help power project decision, which has great practical significance.
Keywords/Search Tags:power grid construction project, technology evaluation, economy evaluation
PDF Full Text Request
Related items