The establishment of the EARLY WARNING SOFTWARE PROJECT is mainly aimed at providing early warning analysis for the supply and demand situation and its impact, providing accurate, timely and reliable information to support the decision-making of macroeconomic regulation and control of food, and providing a scientific analysis system to ensure national food security. The EWS project involves the natural sciences, social economics, systems engineering, computer science, management and many other knowledge subjects. Its development, which involves a wide range of research, is a difficult and complex work, and needs for effective resources integration and good planning supervision and control. Therefore, planning control and management of the EWS project is of great complexity and challenge.In the 21st century, it is a big trend that the software project management is introduced in the developing activities and its efficient administration. Through the management of costs, personnel, schedule, quality and risk during the process of software development, it will ensure the software project being successfully completed with predicted cost, schedule and quality. The rational planning control and management is an important part in a software engineering project. And how to apply the appropriate software project management theory with flexibility becomes one of the key problems in software development project. Scholars at home and abroad had done a great deal of research in schedule planning and control technology of the software development process. They achieved fruitful results in the standard content and tools platform of predictive control of the software engineering, but lacked of systematic research in the specific methods of process control. This paper used modern project management theory and methods, combined with planning control and management of the Early Warning software Project. Based on the analysis and comparison of the management indicators and efficiency, by using different project management methods, it tried to investigate and propose the suitable management method for software project progress control, and donated to the effective development and management of large-scale software project.For the first time, this paper introduced the EARLY WARNING SOFTWARE PROJECT management from the point of view of the combination of planning and cost control, and applied specific planning and control methods in the EARLY WARNING SOFTWARE PROJECT.At first,described the background and foundation of this study, present status a, and the research content and framework. The article reviewed and forecasted the situation of research in the software developing project management at home and abroad, roughly sited forth the prospect of planning control and management in the EARLY WARNING SOFTWARE PROJECT project.Mmainly analyzed present status, the problems and related reasons of them in the EARLY WARNING SOFTWARE PROJECT project, so as to raise the importance of planning control and management, and the urgency of scientific project planning control and management. The article began with describing the planning and control methods used in the current project management, and then pointed out the simplicity and defects of existing methods by indicating that it is the reason of lack of standardization in project management and problems in scheduling. The article indicated the need of seeking effective planning control methods in project scheduling, cost and quality control. It fully demonstrated the importance of planning control and management in the EARLY WARNING SOFTWARE PROJECT project.On the seeond, described the study of scheduling of system implementation. The article clarified the developing process of the EARLY WARNING SOFTWARE PROJECT project: determined the project objective, organizational structure, project milestones; decomposed the WBS work; determined the relationship between the works; estimated the workload, worked out project plans and human resource planning; analyzed the project cost. In this chapter, the authors chose and analyzed the schedule planning management methods based on the EARLY WARNING SOFTWARE PROJECT project. By using and comparing with Gantt charts, network diagrams, PERT and critical path methods, the study provided the evidence for the final planning control the optimal model.And then ,detailed the study of the process control of system implementation. According to the characteristics of the progress control management for the EARLY WARNING SOFTWARE PROJECT project, firstly, it detail analyzed the basic procedures of project schedule control, main contents, functions, and the basic model of project schedule control; and then specifically addressed the control methods of the EARLY WARNING SOFTWARE PROJECT project. Based on detail introduction of the control methods of the time limit for the project, in connection with the characteristics of the EARLY WARNING SOFTWARE PROJECT and schedule delay situations, the article optimized the development schedule by using the methods as adjusting the working relationship and transferring of critical path. With respect to the project cost control, it analyzed the content, basic parameters and related analysis functions of the Earned Value Analysis. Combined with the resource consumption and cost budget of the EARLY WARNING SOFTWARE PROJECT project, it calculated and analyzed the one-time costs control, in order to achieve clear and unified effects.Finally, the author evaluated of the operation of the EARLY WARNING SOFTWARE PROJECT and pointed out how to optimize the system. First, the study gave out characteristics and difficulties of the project planning control and management. Second, it analyzed effects of the planning control and management, and problems in detail. And then, it proposed the countermeasures for establishment of the progress early warning systems, dynamic control and coordination administration. And finally, based on principles, processes, and effective methods of the EARLY WARNING SOFTWARE PROJECT project schedule planning, it initially proposed the optimal model for planning control and management.In summary, this paper selected planning control and management of the EARLY WARNING SOFTWARE PROJECT as the point cut, used of modern management theory and project management knowledge, linked with practice, combined common management theory with specific software project management. By using the schedule, cost and quality control methods, it provided systematic analysis, practical application, and better solution of existing problems in the EARLY WARNING SOFTWARE PROJECT. With introducing the advanced project management concepts and methods, this study could play a significant role in the successful implementation of the EARLY WARNING SOFTWARE PROJECT project. |