Jiangsu Telecom Global Eye Platform Construction Project Schedule Management

Posted on:2011-07-05Degree:MasterType:Thesis
Country:ChinaCandidate:L Y WangFull Text:PDF
GTID:2199360302498926Subject:Project management
Abstract/Summary:PDF Full Text Request
The global eye network video frequency monitoring service is one item which promotes by the Chinese telecommunication completely based on the broadband networks image long-distance monitoring, the transmission, the memory, the management new value-added service. Global eye network video frequency monitoring provision of service 24 hours uninterrupted, unmodifiable real-time image and sound information transmission, provides functions and so on moving surveillance, warning, image storage. The global eye long-distance image monitoring service is suitable for the public security profession, the oil industry, the bank, the road traffic, the environmental monitoring, the electric power, the commercial aviation, the customs, the chain-like business place and so on, needs to carry on the image long-distance monitoring, the transmission, the memory and the management place.Presently, the network video frequency monitoring demand starts to enter the high speed rise period. The Jiangsu telecommunication original network video frequency monitored the platform capacity already far not to be able to follow each profession customer the video frequency monitoring demand. Therefore, the plan constructs the new Jiangsu telecommunication whole world eye platform, the construction capacity can provide the entire province 100,000 user camera network video frequency monitoring ability.How reasonable newly built Jiangsu telecommunication whole world eye platform, this is the question which the project group must face, but the progress control is also in the project an essential key link, project progress and economic efficiency connect closely. Cashes the progress of works on time or cashes the progress of works ahead of time, this to satisfied the telecommunication market demand to have the very vital role. In the construction item management to the time progress control, namely in the definition time, draws up reasonably, the economical construction progress schedule, in carries out in this plan process, whether the periodic inspection actual progress does carry on according to the plan request, if presents the deviation, then promptly discovers the reason, takes the essential remedial treatment or the adjustment, the optimized original plan, is completed until the project. Is also in the project construction entire process, through plan, organization, coordinated, methods and so on inspection and dispatch, mobilizes all positive factors, achieves in the construction process each stage goal diligently, from guarantees the total time goal realization.The present paper will analyze the Jiangsu telecommunication whole world eye platform construction project, especially the question which exists in the progress control. first analyzes the project the goal, the scope, the resources, the influence factors of works, thus formulates the project to consummate, the science plan. In the project implementation process utilizes the third-level schedule management theory and the progress/cost integrated control principle, and the full utilization computer software technique, the tendency carries on the monitoring to the project implementation situation. In view of the existence question, between the actual progress and the plan deviation, adopts effective optimized, the adjustment progress method, the safeguard project smooth completion test, the place in operation.The paper uses the research technique which the theory and the practice unify. Launches take the engineering construction project various stages' progress schedule management and the progress control measure as the master line, chooses one appropriate tool method to apply in the Jiangsu telecommunication whole world eye platform construction project. The hope can expand in the solution communication engineering project construction through this article research to have the problem the mentality, enables the communication engineering project management question the effective solution, promotes the telecommunication the profession competitive power.
Keywords/Search Tags:Global eye, progress schedule, progress control, Earned Value Management
PDF Full Text Request
Related items