Font Size: a A A

Risk Control Of Equipment Relocation In The Communicational Network

Posted on:2010-05-11Degree:MasterType:Thesis
Country:ChinaCandidate:Y L ZhangFull Text:PDF
GTID:2189360278465675Subject:Project management
Abstract/Summary:PDF Full Text Request
With the development of the communication and technology, communications equipment replacement soon. With the user's communications needs continue to change and growth, some of the communications bureau at the old room in the engine room area with the allocation of environmental and other aspects have been unable to meet the new demand for business equipment and the rapid development, but also because of urban development and construction will be affect the security of fiber optic communication line.In order to ensure the operation of communications equipment and network security to ensure the smooth flow of communication, it will need room to move equipment from the old to the new room, usually including the relocation of equipment, Gejie circuit, the layout of the room, and so on. At the same time, there are also an important issue, that is, in the communications network business can not be interrupted, and this relocation of a higher demand, and that is not interrupted in the communicational network equipment business, the relocation project.According to this thesis topic for many years, as well as the work of the practice in the day-to-day work taken as a basis for a variety of solutions, Netcom will be the relocation of equipment as a project, a special projects requested by focusing on its projects Risk research. From the risk management of the project to analyze, through risk identification, qualitative and quantitative risk analysis, should plan to monitor and control all stages of research and put forward effective measures to deal with this in the future more and more in the net The relocation of communications equipment made a reference model, making the Network of equipment to move up to a height of the project, even in the network equipment business and Ge Jie, the relocation of the engine room can be carried out reference, as a basis. At the same time, its risk management research will make the relocation of equipment more better, more efficient.
Keywords/Search Tags:in the communicational network, communicational equipment, relocation, risk control
PDF Full Text Request
Related items