Research On Baosteel Precise Steel Tube Plant Relocation Project Progress Plan And Control

Posted on:2014-11-07Degree:MasterType:Thesis
Country:ChinaCandidate:X L KaoFull Text:PDF
GTID:2359330512471456Subject:Project management
Abstract/Summary:PDF Full Text Request
With the rapid development of economy,the new land resources are very limited conditions,the relocation and transformation in recent years and in the future become a trend in recent years.And the relocation of enterprises is different from the new,need to fully consider the old equipment eliminated inherent equipment reuse,process layout,equipment selection and other factors.Also,because of the Shanghai municipal engineering construction requirements,is located in the Yangtze River Road West of Baosteel precision steel pipe factory will be the overall relocation out Zhang huabang plots.According to Baosteel deployment,precision steel tube factory relocated to a whole Baosteel directly owned beach plot,improving optimization and the main production,testing equipment synchronous implementation of product structure adjustment and production process layout.Precision steel tube factory structure optimization considering the line position,and will play the small batch,multi specification advantage,realize complementary synergy and steel Baosteel steel division,seamless steel tube plant,enhance the comprehensive competitiveness of Baosteel steel tube product.As a professional production of unit steel Baosteel steel division precision seamless steel tubes,precision steel tube factory production of steel products are widely used in power station boiler,oil,chemical industry,some products are exported to the United States and other countries and regions,deeply domestic and foreign users,has become one of the main production plant,the domestic manufacturing of power plant boiler tubes varieties the largest,most complete specifications of the.To tie in with the Shanghai municipal construction need,Baosteel decided to the whole plant relocation,and approved the implementation of precision steel product structure optimization of construction project.Precision steel product structure optimization after completion of the project,mainly the production of automobile tube,pipe,tube,military aviation high-pressure boiler pipe,oil casing of five varieties of categories,forming coordination and seamless steel pipe factory 140 units,and further enhance the comprehensive competitiveness of Baosteel steel tube product.Project management and the concept of human resources,in this paper,the progress,quality,material,risk,communication,security and other aspects of relocation involves work has carried on the detailed planning and research.The main part of this paper intends to analyze the connotation and characteristic of project management,the necessity and feasibility study of the project,fully expounded the startup reason;and the human resources plan,schedule,material distribution plan,schedule,quality plan,the communication plan,safety management plan for a detailed description of the last part of the article;for each plan more clearly put forward the implementation and control of project.The implementation of the project plan in the effectiveness,performance,accuracy has its own characteristics,and gives the implementation process through actual validation,also provides beneficial experience for the relocation project in the future.
Keywords/Search Tags:Relocation project, Progress plan and control, Risk analysis
PDF Full Text Request
Related items