The Research Of University Engineering Construction Item Cost Control

Posted on:2009-01-27Degree:MasterType:Thesis
Country:ChinaCandidate:Y Q JiFull Text:PDF
GTID:2189360275985847Subject:Project management
Abstract/Summary:PDF Full Text Request
China's Universities in the rapid development of the background,the college construction projects exist "super budget estimates,the budget estimates for super,super-clearing budget" three excesses phenomenon.This is a serious waste of the state's capital investment in the development of colleges and universities,colleges and universities at the same time greatly diminishes the effectiveness of the input and output.Therefore,in the state's higher education into the cause of increases every year,colleges and universities are building rapid and effective control of the college construction project cost of the investment is more important.In this paper the author of the project management under the relevant knowledge and years in college financial management experience,a lot of relevant information available under the premise of the project from the University of design,construction and completion of three projects at different stages of the project demonstrated the control of investment key point-cost control. Universities hope to find a solution control of the project cost effective method is designed to reduce the "three excesses" in theory provide guidance.This paper summarizes the construction projects at home and abroad and cost control theory based on the experiences gained with domestic college construction and characteristics of the status of colleges and universities construction project cost control for a more detailed and comprehensive analysis.First,a brief introduction of university infrastructure projects and cost characteristics and the type of college infrastructure construction projects cycle and cost control,after the three different stages of focus respectively on the different stages of the specific methods and cost control measures and,in conjunction with the China National Offshore The University Coliseum specific construction projects,elaborated various stages of the control method,in which different stages of a reasonable and effective way to control costs. From the construction of the entire process of project implementation,cost control investment in the project should be the focus of the decision-making stage and the design stage, construction projects in colleges and universities in the design phase should pay attention to: the impact of engineering design and project cost control a key link;use of standardized design determine reasonable costs of using value engineering control costs effectively;use of value engineering to limit distribution.However,in view of the entire process of construction projects is the overall Central link,the construction phase investment of course,cost control should not be overlooked:the establishment of cost management accountability,responsibility, right,Lee integration in accordance with the quantity,price,the principle of separation,control engineering direct costs engineering change control;standardized,plug loopholes Dengjie waste of the construction phase of the project cost effective control method.Ending phase of the project,the completion of the works must be based on the accounts of the construction contract,and the lump sum price contract,a different inspection procedures.In this paper the characteristics of the advanced engineering at home and abroad from the project's construction cost control concepts,and project management combined with modern theory of new ideas,results,using technology to economic theory results of the college construction projects will cost a more reasonable issues detailed The study,we respect the creative and design patterns,and also takes into account cost management purposes.The entire process of project control concepts,as well as the different stages of the project cost control methods and the many measures,and based on value engineering and AHP cost control at the design stage of the specific methods of operation,aimed at colleges and universities in China Project cost control the entire process for reference,and try to build for our college project cost management raise the overall level of reference.
Keywords/Search Tags:College construction projects, Cost control, Value Engineering
PDF Full Text Request
Related items