Research On Claim Event In Concurrent Delay

Posted on:2009-12-05Degree:MasterType:Thesis
Country:ChinaCandidate:C J HongFull Text:PDF
GTID:2189360245979876Subject:Technical Economics and Management
Abstract/Summary:PDF Full Text Request
Construction claims is an important measure, which protects the party's interests of construction contract, and in the core content of project contract management. As a special form of construction claims, Concurrent delay claim broadly exists in construction claim events. At same time, how to deal with concurrent delay event correctly has became one of difficulty contents in construction claims, which is precondition for protecting all responsibility party justice behalf in concurrent delay. It is increasing attached importance as a significant index that test the level of the project contract management of a corporation and nation.This paper is based on theory research article on concurrent delay, referencing the《contract conditions of FIDIC》in 1999 and.《construction project building contract》(criterion paper) in 1999 By anglicizing the advantages and disadvantages of responsibility distributing principles on concurrent delay in exist, discussing the concurrent delay responsibility distributing principle, criterion and relationship between time claims and cost claims on concurrent delay, calculating ways on concurrent time claims and cost claims. This paper is divided in several parts, just as fellow:Fist part: Referencing《contract conditions of FIDIC》in 1999.and《construction project building contract》(criterion paper) in 1999 This paper analysis existed responsibility distributing principles on concurrent delay time claims and cost claims, calculating way on concurrent delay time claims and cost claims, the aim to which is providing theory basement for discussing dealing principle on concurrent delay claims.Second part: comparing the advantages and disadvantages on concurrent delay responsibility distributing principles on concurrent delay time claims and concurrent delay calculating way in existed, based on which, building the responsibility distributing principle on concurrent delay time claims—dynamic responsibility analysis method, responsibility calculating mode on concurrent delay time claims—dynamic responsibility analysis mode.Third part: By comparing the advantages and disadvantages on concurrent delay responsibility distributing principles on concurrent delay cost claims and concurrent delay calculating way in existed this paper combined concurrent delay characters, constructed cost claims calculating method on concurrent delay- reason proportion analysis calculating method and responsibility distributing principles on concurrent delay, at same time, building the mode on concurrent delay cost claims- reason proportion analysis calculating mode.Fourth part: To test validity on the concurrent delay time claims and cost claims mode, this paper applies the case into these mode to computing, based on the result anglicizing the relationship between the concurrent delay time claims and cost claims.During the discussing period on concurrent delay, this paper analysis the concurrent delay time claims and cost claims, constructing the criterion on concurrent delay time claims and cost claims, aim at the character of concurrent delay claims constituting and proving the distributing principles ,calculating methods and mode on concurrent delay time claims and cost claims.
Keywords/Search Tags:Concurrent delay, Time claims, Cost claims, Responsibility distribute, Claim criterion
PDF Full Text Request
Related items