Font Size: a A A

Shentou No.2 Power Plant Clean Production Verification Implementation Plan Applied Research

Posted on:2009-11-12Degree:MasterType:Thesis
Country:ChinaCandidate:X B WuFull Text:PDF
GTID:2189360242986713Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
Coal-fired power plant manufacture clean energy -electricity, at the same time it consume a large amount of coal and water resources and generate a large amount of pollutants, such as fly ash, dust, SO2, NOx and wastewater.It is an effective way that the coal-fired power plant implement cleaner production audit forimproving the efficiency of resources and energy and reducing environmental pollution.This article study the cleaner production audit of Shentou No.2 power plant and carry out a feasibility analysis of the program that are the flue gas desulphurization, wastewater treatment, and other key projects.Through analysis of low cost and high costs of the programme of environmental and economic, this article point out way of carrying out cleaner production audit in the coal-fired power plant,the program and the propose of implementation of cleaner production audit. This article provide the reference for carrying out cleaner production audit in the coal-fired power plant.
Keywords/Search Tags:ThermalPower Plant, Environmental protection, Management, Cleaner production audit
PDF Full Text Request
Related items