Font Size: a A A

The Research Of Nine Bulls Group's Technician Training Projects Management System

Posted on:2008-04-17Degree:MasterType:Thesis
Country:ChinaCandidate:Z K ZhongFull Text:PDF
GTID:2189360242964854Subject:Business Administration
Abstract/Summary:PDF Full Text Request
In China, enterprises have doubt in cultivating new technicians during the cultivation process. Because the new technician training uses of cultivation methods, and lack of practical experience , so it is difficult to guarantee the qualities and levels of technicians . The administration system in order to ensure the effect of the training, so it can set up the framework and the procedure of the technicians training or use a full of guiding principle ,such as the framework ,the table, to manager the implement of the item ,the life circle, the resource, the communication, etc. Therefore, the research of technician training project management system is great practical significance.The paper analyzes the present situation of the Nine Bulls and competitive circumstance in the inside and outside, finds out the problem of the item administration, analyzes the possibility of building the item management system in the group, and designs the pattern of the training item management system. The item training management system can divide into five parts from the structure: the total aim and principle of the item management, the important fields of the item management, the organized composition of the item management, the procedure and method of the item management, and the controlling system of the item management. The main contents include the organized management, the objective management, the procedure management, executive management, the information management etc, five parts. The system sets up decision-making layer, management layer and executive layer. The item management should think the unity and realism of strategy aim, management aim and the item aim, build the training controlling system, enhance the item management and domination of the item starting, planning, executing,controlling and managing and controlling the final affairs. Strictly managing implement, carefully organizing project team, establishing project plans and tracing and controlling, the key lies in the management and control of quality, progress and cost, enhancing information management, getting done with decision analysis and work report.The planning of Nine Bulls Group's projects management system is carried out in three steps: investigation, putting in practice and running. Through the study of the practice and feedbacks, we discussed and found that the promotion from superior officials and insurance measures such as organizing, systems and staff training have great significance in bringing the projects management system into effect.This paper discusses the training of Nine Bulls Group's projects management system in details, which can be a reference for other vocation training organizations to operating trainings for highly skilled talents.
Keywords/Search Tags:Technicians Training, Projects Management, Projects Management System
PDF Full Text Request
Related items