Font Size: a A A

Management of the preconstruction process for highway projects using manpower demand prediction model

Posted on:1990-07-28Degree:Ph.DType:Dissertation
University:The University of Texas at AustinCandidate:Persad, Khali RamFull Text:PDF
GTID:1479390017453785Subject:Civil engineering
Abstract/Summary:
The design of a comprehensive microcomputer-based system for managing pre-construction activities and programs in a State Department of Highways is described. Project-related activities from conception to award of a construction contract are researched and structured. Performance on a large sample of projects is analyzed, and models for predicting engineering manhours and durations are developed. Alternative models for estimating manpower demand across a long-term program are presented. The results are integrated in a modularized management system for planning and control of pre-construction projects and programs.;This is the first identified formal investigation of the requirements for managing the pre-construction process. Managerial experience is captured and systematized. The trade-offs between organizational needs and project objectives are identified in the system design. Models for forecasting engineering performance are quantified. The results advance current knowledge of management of engineering activities.
Keywords/Search Tags:Management, System, Activities, Projects
Related items