Font Size: a A A

Study On Project Management Model For Electromagnetic Compatibility Test System Integration Projects

Posted on:2015-02-06Degree:MasterType:Thesis
Country:ChinaCandidate:Z J NieFull Text:PDF
GTID:2309330476452629Subject:Project management
Abstract/Summary:PDF Full Text Request
Electromagnetic compatibility(EMC) is the capability of an electrical product to operate in the electromagnetic environment without disturbing or being disturbed by it. With the development of electrical products in modern mass production, this technology need to be long-term developed. One of the main research work for EMC science is measurement technology. EMC test system integration projects are to integrate the test instruments, measurement method, automatic control method and data post-processing, then to be delivered to customers [2].These are customization projects, which will follow different standards. The purpose to do the study is to solve the issues I met during my work and to define how to manage this kind of projects.I proposed an improved project management model for EMC integration projects after studied on previous working structure and process.During the improved management method, I created some mathematical model to support to manage the projects, like NPV calculation and PPI method for project reduction, Assessment Index and Weight Grade Method for project evaluation, uncertainty analysis model to control the project cost.And I also produced some solutions to strengthen the management method, like templates for kick-off meeting agenda and WBS outline to improve project preparation work, principled negotiation to avoid conflict, templates for milestones checklists and Gantt chart to prevent project delay, and etc.After calculation and analysis for previous two years projects data, it proved new management model enhanced department expandability and engineers’ capability. It also alleviated conflict, saved manpower, and how to maximize the project profit, minimize cost and risks.EMC test systems will be request more compatible in future, it will be required for more design and research work before project launched. And fully-automatic test method and measurement uncertainty control requirements will be raised, which will request us to do more study on quality control.
Keywords/Search Tags:Organization structure and flow chart, reduction for projects, conflict management, cost control, project margin
PDF Full Text Request
Related items