Font Size: a A A

Study On Cost Estimate System Of Water Resources Projects Management

Posted on:2007-09-26Degree:MasterType:Thesis
Country:ChinaCandidate:W G LiFull Text:PDF
GTID:2179360182488691Subject:Water Resources and Hydropower Engineering
Abstract/Summary:PDF Full Text Request
In order to fill the blank, put the center Water Resources industry policy into effect, form the Water Resources projects management good circular mechanism, and build the foundation of the separation for the next projects management, maintenance and repair, the property managements, Constructing the new Water Resources projects overhead charge budget system is imperative. The budget system devotes in causes to form a quantification standard on the quantity calculation, the fund budget and assignment in maintenance and repair work, formulate the scientific & reasonable quantity of the man-power, the material and the mechanical consumption on management, maintenance and repair, determinate maintains the call for fund accurately, standardize institutionalize the project management, and provides the basis for calculation, examination and approval the Water Resources projects overhead charge budget by all levels of water administration department.This article first aims at the prominent question on the hydraulic projects management, and united the hydraulic project management organizational reform, The research the reform necessity, the feasibility and the valid of "the separation for the projects management, maintenance and repair" and then analyzes the existing fund disposition way, establishs management fund reasonable disposition system. After researching hydraulic project administrative funds budget and control plan, Constructs the new hydraulic project overhead charge budget system.The two major part of new hydraulic project overhead charge budget system is composed by the national and the place hydraulic project overhead charge budget standards. The national is according to the national average level formulation standard and is mainly suitable for central hydraulic project (reservoir, sluice, embankment etc.). The place standard is the national standard supplement.The hydraulic project overhead charge budget standard composes by "Hydraulic Project Administrative Unit Expense Budget Establishment regulation ", "Hydraulic Project maintenance and repair Budget quota" and "Hydraulic Project maintenance and repair quantity calculation regulation ".To establish standard, investigation on the project spot is first step, and then Collect the massive foundations data and carries on the statistical analysis, calculate the quantity of quota by the many kinds of technical methods, after surveying the project examples, the appropriate quota level will be determined finally.
Keywords/Search Tags:the hydraulic project management, charge budget, the separation for the projects management, maintenance and repair, Budget Establishment regulation
PDF Full Text Request
Related items