Research On Quality Control In The Implementing Of Ethylene Engineering Construction Project Of A Million Tons Produces Per Year

Posted on:2012-03-18Degree:MasterType:Thesis
Country:ChinaCandidate:J LiuFull Text:PDF
GTID:2189330332497478Subject:Project management
Abstract/Summary:PDF Full Text Request
The Tianjin WanQuan equipment setup Limited company is China Petroleum and Chemical Corporation Tianjin Subsidiary company's Sister enterprises. After process remanufacture, The Company's management pattern entered a recent development time. Constructs the Tianjin Petrochemical 100 millions tons/year Ethylene Project is one of the important developmental strategy plans of the WanQuan Company's "Twelfth five". It's the Binhai newly developed area important economic development goal. The construction projects of Ethylene undertaked by Tianjin WanQuan Equipment Installation Co. Ltd. has made great contributions to the economic development of Tianjin Binhai New Area. On the other hand, also sets up the formidable brand image, foundation popularity, Develops the market for the WanQuan company to play the unreplaceable tremendous role.The Tianjin Petrochemical 100 millions tons/year Ethylene Projects including the Ethylene Project, the Refinery Project, the Thermoelectricity Project and the Project of Outside Area, altogether have 213 basic term projects. And the Ethylene project part has 75 basic term projects, the Refinery project part has 93 basic term projects, the Thermoelectricity project part has 38 basic term projects, the Project of outside the area mainly has 7 basic term projects.This article utilizes the quality control theory into the 100 millions tons/year Ethylene Project construction. First, Analysis of the environment, materials, equipment, personnel and methods on the impact of Ethylene Project implementation process. Thought that the project quality control the key aspect is "the personnel" and "the material". The human is the first factor to affects the project quality. It's the policy-maker, the organizer, the captain and the operator of the direct participation engineering construction. Only take the human for the control power, arouses person's enthusiasm fully, display "person's factor first" leading role, could have the direct guarantee to quality during the engineering project implementation. The material is the main body of basic construction. The material not meet standards, the project quality cannot meet the requirements naturally.According to analysis of Ethylene Project Construction's influencing factor, regarding the quality objectives and quality plan of Ethylene Project Construction, carry on the engineering project quality plan. The engineering project quality plan including the appraisal before the project construction, the project contractor system and the technology give the low-down; In the construction process's material approach, the model construction, the license construction, the process three examine and the quality veto; The product protection, the quality document record, the project quality evaluation and the completion approval ay the end of construction. With engineering project related resources plan, With engineering project related resources plan, including after construction resources plan and before construction resources plan. Finally, to consummate the quality information system according to the project construction's needing, establishment supervising mechanism. The WanQuan company mainly undertakes the project content has the construction foundation manufacture, process unit and machine's installment, pipelining, electric instrument cable laying, steel structure installment and so on. The Ethylene Project Construction's quality control is one involves the multi-departments, the multi-links, the complicated and diversified systems engineering. Its complex characteristic has decided the stern of quality control in the project process. In ethylene project items of basic construction, The quality control follows the following principle:Insisting that the quality first, The user is supreme; Insisting by the artificial core, humanist idea; Prevents primarily; Insisting that the quality specification, the strict inspection, all speak with the data; Implement scientific, fair, law-aiding professional standards.The quality control before the Ethylene Project implementation's mainly refers to the mediation personnel preparatory work and the technology preparatory work. In the project implementation stage, the quality control carries out two control procedures. First, the macroscopic procedure, mainly aims at as Construction's WanQuan company and the overseeing company, the development organization quality surveillance department, the government quality surveillance department the process which examines about the construction quality surveillance. Through constructors quality check, construction enterprise quality engineer self-checks, oversees engineer the audit trail, the development organization project management quality supervisor spot-checks recognized, the quality surveillance station control inspection confirms this a series of processes, guaranteed that the project quality approval is qualified. On the other hand, It is the construction working procedure control, In actual project construction process's each step working procedure is defers to the management concept of PDCA circulation. Enables the quality control to obtain further promotion, guarantees the project quality finally. In the Ethylene Project items of basic construction implementation process, The WanQuan company to essential program execution key control, establishment quality control point, according to the construction working procedure important degree, to choose stops examines and must examine. After the engineering project implementation's quality control is mainly coordinates the Development organization to carry on completion approval, the end product protection and the construction reference material reorganization. The reference material mainly includes the material of project construction technique management, project quality restricted data, project construction quality approval material, completion chart four major part.Finally, from the analyses of management, finance, personnel and company creditworthiness expectation effect, obtained the quality control to make the huge progress in the ethylene project items of basic construction.
Keywords/Search Tags:Ethylene Project items of Basic Construction, Project implementation of quality management, Project quality plan, Project quality control
PDF Full Text Request
Related items