Font Size: a A A

The Design And Implementation Of The Integrative Real-Time Power Information Collection And Management System

Posted on:2010-08-27Degree:MasterType:Thesis
Country:ChinaCandidate:K P ChenFull Text:PDF
GTID:2178360278974042Subject:Software engineering
Abstract/Summary:PDF Full Text Request
China's Demand Side Management Study and Application of Technology began in the 20th century, around 90's, faced with the situation of power shortage, much the power company has launched a load control system, substation system, meter system of customers, improve the management of real-time customer at the scene of the degree of wear and tear to carry out power system analysis, and orderly use of electricity, electricity demand, such as load forecasting side management to provide an effective technical support.Under specific historical conditions, the construction site management system with a wide range of applications, to ease tension in the power supply and demand, electricity and orderly implementation, to ensure grid security, to ensure that the essential use of electricity load has played a major role. However, However, with changes in electricity supply and demand, electricity deepening structural reform and competition continue to adjust the pattern, which scattered in every historical period of construction in order to load control management system for site-based management concept, the overall integration, technical system , the system features, scalability, maintainability, reliability, and so more and more difficult to meet the demand for rapid response group of companies unable to meet the changing needs of the market, to some extent, hampered the level of marketing management services to a higher level improve the pace.This paper proposed the establishment of timely coverage of all electric power companies to set energy information collection, monitoring, load control, electric energy information analysis, decision-making power in one of the integration of information collection and management of real-time analysis system, a comprehensive normative functions, technical architecture and communication Statute, and have set up a high degree of information sharing, smooth operation, scientific and standardized real-time data acquisition and control platform.First of all, this paper discussed Integrative Real-Time Power Information Collection and Management System for project management background and their development problems faced by the design on the basis of the business functions of the system, the data needs of applications for the identification and analysis, carding a the system data flow. In the above-mentioned work on the basis of the system to identify and put forward key issues.Summary design of the basis of needs analysis, system design objectives and principles described, the system from the technical architecture, functional architecture and network architecture design.Detailed design of the outline design is completed based on the architecture design, detailed design of the system. In which the author focuses on the design and development to participate in the front collection service, detailed design, including the communication component design and the design of the Statute to resolve. At the same time, demand-driven analysis of key issues raised by the issue given solution.And then introduced the system mainly to introduce the author to participate in the front collection service to achieve the realization of the content. Article on the front collection service communication component, data processing component and analysis component of the realization of the Statute and the achievement of the content of the course of a detailed description of the key technology and key business processes are described. This section is also the realization of applications are introduced.Followed by. disscused the testing of the system, including tests on the functionality of business systems and front-end system testing.Finally, a summary of the paper and pointed out that the current system there are still deficiencies.As the main designers, I involved in the integration of energy acquisition and management of real-time information analysis system analysis, design and code work, concrete work, including: design of participation in system, design of data acquisition is responsible for needs analysis, design of management is responsible for data acquisition, front collection service design; front collection service to participate in the realization of the code.System as a whole I have a good grasp of the technology itself is responsible for more insights. In this paper, the realization of the entire system, and focus on what I am involved in the management of data acquisition and pre-acquisition system needs analysis, system design and code work. Among them, the pre-acquisition services in the design and the Statute of channel adapter agent design is my creative work, to solve a variety of channels, a variety of communication terminal equipment of the Statute of the unity of the problem of access. Observer and pipeline model of technology and applications to solve real-time massive data processing and storage problems. These two technologies can be applied to the system not only to other large-scale application system also has a very high value, and have good prospects for development.
Keywords/Search Tags:integrated design, demand side, energy information collection, management, data analysis
PDF Full Text Request