Font Size: a A A

A Study Of WCDMA Wireless Network Incipient Planning In Yuncheng Area

Posted on:2008-06-01Degree:MasterType:Thesis
Country:ChinaCandidate:Q J LiFull Text:PDF
GTID:2178360215483585Subject:Electronics and Communications Engineering
Abstract/Summary:PDF Full Text Request
With the steady development of the china communication, communication technology has become important competing means and reasoning conditions between communication companies in the market. Along with furious competition of license of 3G, 3G technology standard is gradually built up.3G technology and equipments have become mature. And 3G network planning is being brought forward. It is the key problem how to rationally build 3G mobile communication network in the market, network planning and construction. Because there is not large-scale marketing network, many communication companies take more care of network incipient planning.In the face of stinging competition situation, quickly offering operations, reducing managing cost, and enhancing communication service quality have become the key factors among mobile communication companies in market competitions.The main of these key factors mainly focuses on basic network constructions. Transferring network is the basic load network in the telecom network. Therefore, planning and constructing 3G transferring network play an important role in the whole development of 3G network.In the optimization and construction of 3G transferring network, we should mainly consider the following questions: how to build the relation between traditional mobile operations and rising data operations; how to consider the cooperating and com-using relation between traditional transferring network adapting language operations and 3G transferring networks adapting new data operations; how to well consider technology cost and user needs. In the awarded licenses of 3G of the world, nearly 80% bases on WCDMA license. In the way, it is very important to study WCDMA technology and to research construct network. This paper combines WCDMA technology characters and derives experiences building GSM network. This article primarily discusses characters, contents, and processes of planning WCDMA wireless networks. And then combining the fact of Yun Cheng area, with enough advisement of constructing cost and expanding capacity, this paper brings forward pre-layout plan of Yun Cheng urban area. WCDMA wireless network preliminary construction is the use of WCDMA wireless network pre-layout method.
Keywords/Search Tags:WCDMA, Wireless network, Budget, Planning project
PDF Full Text Request
Related items