The Study On The Schedule Optimization Of Water Project In Resource Constraints Condition

Posted on:2011-10-02Degree:MasterType:Thesis
Country:ChinaCandidate:S L XuFull Text:PDF
GTID:2132360305975163Subject:Technical Economics and Management
Abstract/Summary:PDF Full Text Request
As project management was a important area of modern management system,it has integrated the region of manufacturing and engineering and construction in china .With the number of large-scale projects improving, The theory of project management should be increased and breakthroughed.Under this condition of breakthrough theory , management level will be a form of normalization.Not only construction unit and design unit ,but supervision unit have some drawback that was reflected with not timely communication and Inattention management ,Besides,not timely access to datas in lots of managment departments.with so many bad habits , The level of project management was a statement of stagnation. Schedule management with scientific method would achieve goals of schedule subjects which include schedule objectives,preparation of schedule,resource supply plan and schedule control. Based on optimization system of quality and cost , it would be achieved goals of time limit from project.Project duration ,cost and quality management were important controlled factors in modern project management ,but these factors have effects on any .engineering project management.This article will discuss the study on the schedule optimization of water project In resource constraints condition.Based on refering to related schedule optimization of water project in resource constraints condition,the article analyzes water project construction goals that include the restrict factor and program outline, beside scope of work and so on .Though setting up the model of earned value management,we could find out the schedule optimization evaluation and consequence which is based on the analysis of WuDu water project construction.This water project is a valuable significance one.,and the position is located in Junction between SiChuan province and YuNan province. In spite of this actual analysis belong a part of water project,we could get the the costs of project and degree of optimization through analyzing the data sets.after getting the results of optimization,data sets will be used to contrast to the original plan form of this project.At last,this article presents the imperfection and problems of construction based the water project optimization in china,and brings up the program of optimization projects.These solutions of optimization projects have a great effects on progress of optimization projects in china.
Keywords/Search Tags:Resource constraints condition, Schedule optimization, WuDu water project
PDF Full Text Request
Related items