Font Size: a A A

Research On Equipment Procurement And Supervision For Qinshan Nuclear Power Plant Phase Ⅱ

Posted on:2008-06-30Degree:MasterType:Thesis
Country:ChinaCandidate:H ZhongFull Text:PDF
GTID:2132360242476511Subject:Nuclear energy and technology projects
Abstract/Summary:PDF Full Text Request
As the model of localization of nuclear power plant construction and management, the equipment procurement of unit 1&2 of Qinshan Nuclear Power Phaseâ…¡has adopted the managerial pattern of"Self-procurement based on individual equipment", which has proven to be applicable by practice as well as their continuously steady operating performance. The equipments procured have reliable quality. Having absorbed the experience of unit1&2 in equipment procurement and supervision management, the Extension Project, which follows the same equipment managerial pattern of"Self-procurement and Self-supervision", is also improving and developing gradually. A routinized, standardized and informationized management system has basically taken shape.With the current situation of its counterparts both at home and abroad as background, the essay makes research of the equipment procurement and supervision management found out during the execution of Qinshan nuclear power phaseâ…¡and the Extension Project. Such pattern is on the way to maturity. In the essay, the model of"Group-reactor Management of Nuclear Power Projects by owners"is raised and the workflow is improved and optimized. Moreover, not only does the author establish the procedural system of equipment procurement and supervision management, but also identifies its ways. Having figured out the effective form for risk identification and the model of risk management plan, the research is applicable to the risk management of nuclear power equipment procurement and supervision. Meanwhile, the research also covers the workflow and method of Detailed Management as well as Group-reactor Management strategy.The essay attaches great importance to the method of equipment procurement and supervision execution. It offers effective solutions to lack of procedure, standard and information that this field is confronted with. The achievement in this research is worthy of reference for equipment procurement and supervision with different managerial models.
Keywords/Search Tags:nuclear power plant, equipment, procurement, supervision, risk management
PDF Full Text Request
Related items